24–28 Jun 2019
Crowne Plaza Brussels Le Palace
Europe/Zurich timezone

Collective effect estimates for the FCC-ee pre-booster ring

25 Jun 2019, 15:30
1h
Klimt (Ground floor)

Klimt

Ground floor

Poster FCC-ee accelerator Poster session

Speaker

Ozgur Etisken (Ankara University (TR))

Description

The FCC-e+e− injector complex needs to produce and to transport a high intensity e+e− beam at a fast repetition rate for topping up the collider at its collision energy. Two different options are under consideration as pre-accelerator before the bunches are transferred to the high-energy booster: using the existing SPS and designing a completely new ring. The purpose of this paper is to present updated studies of the pre-booster ring design and parameter choice, focusing in particular on first estimates with respect to collective effects.

Primary author

Ozgur Etisken (Ankara University (TR))

Co-authors

Yannis Papaphilippou (CERN) Fanouria Antoniou (CERN) Prof. abbas kenen ciftci (Izmir University of Economics)

Presentation materials