14–18 Jan 2019
CERN
Europe/Zurich timezone

Secondary infrastructure for test beams

16 Jan 2019, 10:20
20m
503/1-001 - Council Chamber (CERN)

503/1-001 - Council Chamber

CERN

162
Show room on map

Speaker

Dr Andre Rummler (CERN)

Description

While telescopes are often a core requirement to conduct a test beam experience shows that secondary infrastructure plays also a central role. Secondary infrastructure can be remote control and monitoring of power supplies and stages, positioning tables for telescopes as well as DUTs. Another important part of this secondary infrastructure are means to provide cooling of telescope planes as well DUTs. The ATLAS pixel detector test beam group had several iterations of cold boxes for DUTs since 2009. These employed different active cooling agents (chillers, peltier elements) or passive cooling (dry ice). The latest iteration reaches -40°C and has been used as a semi-permanent installation with the ACONITE telescope by several different detector groups. Some of the previous attempts will be presented and pros / cons discussed. A brief overview of other systems will be given as well.

Primary author

Dr Andre Rummler (CERN)

Presentation materials