Andrzej Siemko
(CERN)
07/05/2019, 08:30
Jan Uythoven
(CERN)
07/05/2019, 08:55
Federico Carra
(CERN)
07/05/2019, 11:30
Antonio Perillo Marcone
(CERN)
07/05/2019, 11:50
Nicolas Magnin
(CERN)
07/05/2019, 14:15
Daniele Mirarchi
(University of Manchester (GB))
07/05/2019, 15:15
Daniel Valuch
(CERN)
08/05/2019, 08:30
Michi Hostettler
(CERN)
08/05/2019, 09:00
Alessio Mereghetti
(CERN)
08/05/2019, 09:30
Jorg Wenninger
(CERN)
08/05/2019, 10:00
Jean-Christophe Garnier
(CERN)
08/05/2019, 11:00
Christoph Wiesner
(CERN)
08/05/2019, 11:30
Christoph Schwick
(CERN)
08/05/2019, 13:30
Kevin Shing Bruce Li
(CERN)
08/05/2019, 14:00
- Machine protection in the SPS overview – LHC extractions, SPS ring
- LS2 upgrades:
- SBDS, injection interlocking
- Absorbers + SMP
- WIC: HIL loop
- BI interlocking plus additional requirements for SMP
- Status and requirements for slow extraction
Handling MDs and non-standard operation in the SPS
UA9, COLDEX, crab cavities
Grzegorz Kruk
(CERN)
08/05/2019, 15:40
New SPS GMT monitoring to be put in place in SPS after LS2
- External conditions – SIS – Timing
- What is in place for the different injectors
- Upgrade of EC foreseen for LS2, problems interfacing FGC
- Longer term plans for SIS and external conditions development. Should these two be merged in the long-term future (next to a hardware BIS)?
Bettina Mikulec
(CERN)
08/05/2019, 16:40
- Booster interlocking
- Upgrade of switching magnet power supply BHZxxx which leads to dump
- External conditions, SIS, BIS and 4-ring flexibility
- Procedures for masking BIS and making changes to timing to get beam for <4 rings. Automate? Software, reminders?
- Fault diagnostic – BIS diagnostics by cycle. BIS GUI OP and history buffers.
- Operability?