  1. Andrzej Siemko (CERN)
    07/05/2019, 08:30
  2. Markus Zerlauth (CERN)
    07/05/2019, 08:40
  3. Jan Uythoven (CERN)
    07/05/2019, 08:55
  4. Christos Zamantzas (CERN)
    07/05/2019, 09:10
  5. Jiri Kral (CERN)
    07/05/2019, 09:40
  6. Anton Lechner (CERN)
    07/05/2019, 10:00
  7. Tom Levens (CERN)
    07/05/2019, 11:00
  8. Federico Carra (CERN)
    07/05/2019, 11:30
  9. Antonio Perillo Marcone (CERN)
    07/05/2019, 11:50
  10. Chiara Bracco (CERN)
    07/05/2019, 13:45
  11. Nicolas Magnin (CERN)
    07/05/2019, 14:15
  12. Francesco Maria Velotti (CERN)
    07/05/2019, 14:45
  13. Daniele Mirarchi (University of Manchester (GB))
    07/05/2019, 15:15
  14. Jelena Spasic (CERN)
    07/05/2019, 16:15
  15. Ivan Romera Ramirez (CERN)
    07/05/2019, 16:45
  16. Valerie Montabonnet (CERN)
    07/05/2019, 17:15
  17. Daniel Valuch (CERN)
    08/05/2019, 08:30
  18. Michi Hostettler (CERN)
    08/05/2019, 09:00
  19. Alessio Mereghetti (CERN)
    08/05/2019, 09:30
  20. Jorg Wenninger (CERN)
    08/05/2019, 10:00
  21. Jean-Christophe Garnier (CERN)
    08/05/2019, 11:00
  22. Christoph Wiesner (CERN)
    08/05/2019, 11:30
  23. Christoph Schwick (CERN)
    08/05/2019, 13:30
  24. Kevin Shing Bruce Li (CERN)
    08/05/2019, 14:00
    • Machine protection in the SPS overview – LHC extractions, SPS ring
    • LS2 upgrades:
    • SBDS, injection interlocking
    • Absorbers + SMP
    • WIC: HIL loop
    • BI interlocking plus additional requirements for SMP
    • Status and requirements for slow extraction
      Handling MDs and non-standard operation in the SPS
      UA9, COLDEX, crab cavities
    Go to contribution page
  25. David Nisbet (CERN)
    08/05/2019, 14:40
    • Lessons learnt for MP  hole in vacuum pipe, diamond BLMs broken, stripping foil broken, other beam incidents …
    • Report on LINAC4 review
    • BIS configuration – check with PSB talk, as one common BIS architecture. New specification
    • Experience with settings management
    • Outstanding issues
    • Source interlock (RF  HV).
    • Use of timing to select beams. Interface to External Conditions and SIS
    Go to contribution page
  26. Grzegorz Kruk (CERN)
    08/05/2019, 15:40

    New SPS GMT monitoring to be put in place in SPS after LS2
    - External conditions – SIS – Timing
    - What is in place for the different injectors
    - Upgrade of EC foreseen for LS2, problems interfacing FGC
    - Longer term plans for SIS and external conditions development. Should these two be merged in the long-term future (next to a hardware BIS)?

    Go to contribution page
  27. Klaus Hanke (CERN)
    08/05/2019, 16:10
    • Experience with protection
    • Protection strategy mid and long-term
    • External conditions & SIS
    • External conditions upgrade LS2 by BE-ICS  check against talk Greg/Miguel below for overlap
    • No safe beam flag in PSB and PS, manage interlocks per beam type / external conditions
    • What about BIS in the long-term future? PS dump, connection to PSB extraction BIC
    • PS SEM grids and...
    Go to contribution page
  28. Bettina Mikulec (CERN)
    08/05/2019, 16:40
    • Booster interlocking
    • Upgrade of switching magnet power supply BHZxxx which leads to dump
    • External conditions, SIS, BIS and 4-ring flexibility
    • Procedures for masking BIS and making changes to timing to get beam for <4 rings. Automate? Software, reminders?
    • Fault diagnostic – BIS diagnostics by cycle. BIS GUI OP and history buffers.
    • Operability?
    Go to contribution page
  29. Daniel Wollmann (CERN)
    08/05/2019, 17:10
  30. Verena Kain (CERN)