MPP Workshop 2019
Hexagonal
Chateau de Bossey
The principle aims of the workshop are to:
Review the status, foreseen and required changes in the machine protection systems during LS2 to prepare operation with LIU beams. The workshop will cover LHC and injector related topics:
- Learning from Run 2 (injectors and LHC)
- Foreseen changes to the machine protection and related systems
- Challenges in injectors and LHC with LIU beams and other new operational parameters (optics, beam energy, 11 T)
- Preparatory tests or MDs which need to be performed during Run 3 (in the injectors and the LHC), which are outside the operational envelope, to prepare for HL-LHC
Session Chairs:
B. Salvachua & M. Gasior
A. Mereghetti & R. Secondo
C. Wiesner & D. Mirarchi
F. Tecker & V. Kain
Editing/Proceedings:
Sabina-Ioanna Strachinescu, Daniel Wollmann, Markus Zerlauth
Proceedings of the 2019 MPP Workshop: CERN-ACC-2019-0053
Workshop Secretaries:
Sabina-Ioanna Strachinescu
-
-
08:00
Welcome coffee
-
Session 1 - Systems 1
Chair persons: B. Salvachua & M. Gasior
-
1
Introduction - workshop goals and structureSpeaker: Andrzej Siemko (CERN)
-
2
Review of MP workshop 2013/15Speaker: Markus Zerlauth (CERN)
-
3
Running scenario for Run 3 - overviewSpeaker: Jan Uythoven (CERN)
-
4
Beam loss monitor systemSpeaker: Christos Zamantzas (CERN)
- 5
- 6
-
1
-
10:30
Coffee Break
-
Session 1 - Systems 1
Chair persons: B. Salvachua & M. Gasior
-
7
Changes to other BI systemsSpeaker: Tom Levens (CERN)
-
8
Review of safe limits for new collimator materials, experiment detectors and sc. magnet componentsSpeaker: Federico Carra (CERN)
-
9
Review of safe limits for injection and extraction devicesSpeaker: Antonio Perillo Marcone (CERN)
-
7
-
12:10
Lunch Break
-
Session 2 - Systems 2
Chair persons: A. Mereghetti & R. Secondo
- 10
-
11
Beam dumping systems - changes in LS2Speaker: Nicolas Magnin (CERN)
- 12
-
13
CollimationSpeaker: Daniele Mirarchi (University of Manchester (GB))
-
15:45
Coffee Break
-
Session 2 - Systems 2
Chair persons: A. Mereghetti & R. Secondo
-
14
Quench protection systemsSpeaker: Jelena Spasic (CERN)
-
15
Interlock systemsSpeaker: Ivan Romera Ramirez (CERN)
- 16
-
14
-
08:00
-
-
08:00
Coffee Break
-
Session 3 - Protection related tools, MPP and experiments
Chair persons: C. Wiesner & D. Mereghetti
- 17
- 18
-
19
Collimation related software and settings generationSpeaker: Alessio Mereghetti (CERN)
- 20
-
10:30
Coffee Break
-
Session 3 - Protection related tools, MPP and experiments
Chair persons: C. Wiesner & D. Mereghetti
-
21
Post Mortem, Acctesting, LoggingSpeaker: Jean-Christophe Garnier (CERN)
-
22
MPP, rMPP experience during Run 2Speaker: Christoph Wiesner (CERN)
-
21
-
12:00
Lunch Break
-
Session 3 - Protection related tools, MPP and experiments
Chair persons: C. Wiesner & D. Mereghetti
- 23
-
Session 4 - Injectors
Chair persons: F. Tecker & V. Kain
-
24
Machine protection challenges in the SPS
- Machine protection in the SPS overview – LHC extractions, SPS ring
- LS2 upgrades:
- SBDS, injection interlocking
- Absorbers + SMP
- WIC: HIL loop
- BI interlocking plus additional requirements for SMP
- Status and requirements for slow extraction
Handling MDs and non-standard operation in the SPS
UA9, COLDEX, crab cavities
Speaker: Kevin Shing Bruce Li (CERN) -
25
Linac 4 - experience and open points
- Lessons learnt for MP hole in vacuum pipe, diamond BLMs broken, stripping foil broken, other beam incidents …
- Report on LINAC4 review
- BIS configuration – check with PSB talk, as one common BIS architecture. New specification
- Experience with settings management
- Outstanding issues
- Source interlock (RF HV).
- Use of timing to select beams. Interface to External Conditions and SIS
Speaker: David Nisbet (CERN)
-
24
-
15:10
Coffee Break
-
Session 4 - Injectors
Chair persons: F. Tecker & V. Kain
-
26
SIS, external conditions and timing system
New SPS GMT monitoring to be put in place in SPS after LS2
- External conditions – SIS – Timing
- What is in place for the different injectors
- Upgrade of EC foreseen for LS2, problems interfacing FGC
- Longer term plans for SIS and external conditions development. Should these two be merged in the long-term future (next to a hardware BIS)?Speaker: Grzegorz Kruk (CERN) -
27
PS and machine protection
- Experience with protection
- Protection strategy mid and long-term
- External conditions & SIS
- External conditions upgrade LS2 by BE-ICS check against talk Greg/Miguel below for overlap
- No safe beam flag in PSB and PS, manage interlocks per beam type / external conditions
- What about BIS in the long-term future? PS dump, connection to PSB extraction BIC
- PS SEM grids and ‘ralentisseur’
- Which role plays the wall between PS and booster?
Speaker: Klaus Hanke (CERN) -
28
Booster interlocking and operational scenarios
- Booster interlocking
- Upgrade of switching magnet power supply BHZxxx which leads to dump
- External conditions, SIS, BIS and 4-ring flexibility
- Procedures for masking BIS and making changes to timing to get beam for <4 rings. Automate? Software, reminders?
- Fault diagnostic – BIS diagnostics by cycle. BIS GUI OP and history buffers.
- Operability?
Speaker: Bettina Mikulec (CERN) -
29
Conclusions - wrap upSpeaker: Daniel Wollmann (CERN)
-
26
-
08:00