The aims of the meeting are to:
___________________________________________________________________________________
Previous collaboration meetings:
HL-LHC status
i. Review actions from Liverpool collaboration meeting
ii. Milestones for the project at CERN
iii. Summary of future goals for the collaboration
i. Status of the collaboration
ii. Recruitment situation and plans, financial situation, main milestones
iii. Payments for V3 model of stages 1 and 2 including designers
iv. Foreseen publications for 2020
i. Neon, Argon and Nitrogen gas jet formation
1. Measured density and dimensions
2. Light yield comparison
ii. Integration times comparison for different gases:
1. Measured vs predicted
2. Estimation of integration time to work as an overlap instrument
3. Estimation of integration time to work as a profile monitor
iii. Optimisations performed
1. Distances between skimmers and nozzles
2. Diameters of the nozzle diameters 20-30-50 μm
3. Nozzle design
iv. 2020 Experimental Program on V2
1. Nozzle design
2. Alternative skimmer diameters
3. Performance check of V3 instrument (Where, who, how)
v. Design and procurement of BGC V3 parts by Cockcroft Institute
1. Design
2. Procurement
i. Up-date on data analysis
ii. Fluorescence measurements on V3 instruments start Run 3
iUp-date table of gas yields comparison
i. Schedule for the HEL test stand
ii. Update on HEL and electron beam diameter
iii. Update on e-lens parameters and interface
iv. HEL test stand parameters
v. Expected background light with foreseen blackening and light reducing orifices
vi. BGC design in HEL test stand
vii. BGC V3 operation: Foreseen time window, infrastructure space for racks and controls, pumps, power
i. Installation design and status
ii. ECR Progress
iii. Blackening of V3.
iv. Steps towards Stage 2
v. Next nozzles - CD Nozzle & alternatives.
i. Estimation of gas density for V3 LHC and HEL design
ii. Dump optimisation
iii. Optimisation for skimmer diameters for V3 design with expected interaction gas density
iv. Up-date on synchrotron light estimations with V3 design
i. Milestones
ii. To-do list (infrastructure requirements, cabling, gas piping)