The Plans and Status of the ALS-U RF Systems

12 Sept 2022, 10:20
25m
80/1-001 - Globe of Science and Innovation - 1st Floor (CERN)

80/1-001 - Globe of Science and Innovation - 1st Floor

CERN

Esplanade des Particules 1, 1211 Meyrin, Switzerland
60
Show room on map
Oral presentation 20' + 5' Facility status reports Facility status reports #1

Speaker

Kenneth Baptiste (LBNL)

Description

The Advanced Light Source (ALS) is in the midst of and upgrade, ALS-U, an upgrade which will replace the existing triple-bend achromat storage ring with a stronger focusing nine-bend achromat storage ring. The new storage ring’s small emittance and reduced dynamic aperture requires a new injection scheme. ALS-U has chosen an on-axis swap-out injection to exchange bunch trains between the storage ring and new low-emittance, full-energy accumulator ring. To meet the requirements for these two new rings, the 500 MHz storage ring RF system will be upgraded with a new cavity power coupler to meet the new beam loading conditions and will receive new passive 3rd harmonic cavity systems while a completely new 500 MHz accumulator ring RF system, will be designed and installed using solid state amplifiers (SSA) and HOM damped commercially available normal conducting cavities. In this presentation, the details of the new systems will be described and the installation and commissioning plans given.

Primary authors

Co-authors

Presentation materials