31 October 2022 to 4 November 2022
Appart'City Hotel
Europe/Zurich timezone

Session

Session 12 - Surveying concepts and strategies II

Session 12 - Surveying concepts and strategies II
4 Nov 2022, 10:15

Conveners

Session 12 - Surveying concepts and strategies II: Session 12 - Surveying concepts and strategies II

  • Georg Gassner (SLAC National Accelerator Laboratory)

Presentation materials

There are no materials yet.

  1. Davide Bianculli (GSI Helmholtz Centre for Heavy Ion Research GmbH)
    04/11/2022, 10:15
    Oral
  2. Przemyslaw Lewandowski (CERN)
    04/11/2022, 10:40
    Oral
  3. Cristina Gonzalez-Torres (ESRF)
    04/11/2022, 11:05
    Oral
  4. Ms Cristina Gonzalez-Torres (ESRF)
    Surveying Concepts and Strategies
    Oral

    ESRF–EBS (Extremely Brilliant Source) is the ESRF’s 150M€ facility upgrade, over 2015-2022, bringing its scientific users a first-of-a-kind, low-emittance, high-energy synchrotron light source and new, cutting-edge beamlines. With a revolutionary new storage ring concept that increases the brilliance and coherence of the X-ray beams produced by a factor of 100 compared to present-day light...

    Go to contribution page
  5. Mr Torsten Miertsch (GSI Helmholtz Centre for Heavy Ion Research GmbH)
    Surveying Concepts and Strategies
    Oral

    After the adaptation and enhancement of circumstances resulted from the first measurements through glass and occurred peculiarities a successful measurement campaign was done.
    At the FAIR synchrotron SIS100 there exist several superconducting quadrupole doublet modules (QDM). One of these QDM was observed and monitored during three thermal cycles, measuring outer and inner references at...

    Go to contribution page
  6. Przemyslaw Lewandowski (CERN)
    Surveying Concepts and Strategies
    Oral

    The metrology and alignment of components installed in accelerators is a very complicated process requiring many calculations to ensure the best performance of the CERN complex. Throughout the years, surveyors at CERN have been relying on several pieces of offline software, each meant for different purposes, with different text data formats and principles of operations. At the same time, they...

    Go to contribution page
Building timetable...