26–30 Sept 2011
Vienna, Austria
Europe/Zurich timezone

Session

B1a - Systems, planning, installation, commissioning and running experience

B1a
27 Sept 2011, 09:50
Vienna, Austria

Vienna, Austria

<font face="Verdana" size="2"><b>Vienna University of Technology</b> Department of Electrical Engineering Gusshausstraße 27-29 1040 Vienna, Austria

Conveners

B1a - Systems, planning, installation, commissioning and running experience

  • Ken Wyllie (CERN)

Presentation materials

There are no materials yet.

  1. John Coughlan (STFC Rutherford Appleton Laboratory)
    27/09/2011, 09:50
    Systems
    Oral
    The Front End Module (FEM) is a custom on-detector FPGA based digital data acquisition card for the Large Pixel Detector (LPD) currently under construction for the European X-ray Free Electron Laser (XFEL) facility in Hamburg. In normal XFEL operation the LPD detector will generate 10 GBytes/sec of sparsified data for every one mega-pixel of sensor area. Data processed by the FEM is...
    Go to contribution page
  2. Mr Pablo Fernandez Carmona (CERN)
    27/09/2011, 10:15
    Systems
    Oral
    In order to achieve the required levels of luminosity in the CLIC linear collider, mechanical stabilization of quadrupoles to the nanometre level is required. The paper describes a design of hybrid electronics combining an analog controller and digital communication with the main machine controller. The choice of local analog control ensures the required low latency while still keeping...
    Go to contribution page
Building timetable...