Session

Session 7

15 Oct 2024, 14:00
Hefei

Hefei

Conveners

Session 7

  • Hugo Natal da Luz (Czech Technical University in Prague)

Presentation materials

There are no materials yet.

  1. Yue Meng (Shanghai Jiao Tong University)
    15/10/2024, 14:00

    Invited speech
    China’s underground laboratories have emerged as key players in the global effort to explore fundamental physics. The Jinping Underground Laboratory (CJPL), situated deep within the mountains of Sichuan, hosts several cutting-edge experiments. The PandaX-4T experiment, employing a two-phase liquid xenon detector, leads the search for dark matter and precision neutrino...

    Go to contribution page
  2. Siqi He (University of Science and Technology of China)
    15/10/2024, 14:30

    The Micro-Resistive Groove (μRGroove) is a single-stage MPGD featuring a groove amplification pattern. When developed into a cylindrical structure, it requires only two cylinders (electrodes) with independent support foams, offering advantages such as a simple structure, easy installation, and high mechanical strength. Additionally, the cathode of μRGroove can serve as a 1D readout strip...

    Go to contribution page
  3. Riccardo Farinelli (INFN - Bologna)
    15/10/2024, 14:55

    This presentation provides a full review of the R&D for the µ-RWELL technology for the FCC-ee application, with the report
    on update on the detector optimization, on the studies to improve the ASIC, and on the evaluation of the proposed performance within the IDEA framework

    In the IDEA experiment, µ-RWELL technology is proposed for the muon systems and the pre-shower. This MPGD exploits a...

    Go to contribution page
  4. Masato Takahashi (Kobe University)
    15/10/2024, 15:20

    The DLC-RPC, a thin resistive plate chamber based on diamond-like carbon (DLC) electrodes, is being developed for further background suppression in the MEG II experiment. The detector should have ultra-low mass ((< 0.1~\%~X_0)) and high-rate capability (up to (3~\rm{MHz/cm^2})) due to high-intensity ((7 \times 10^7~/\rm{s})) and low-momentum ((28~{\rm MeV/}c)) muon beam passing...

    Go to contribution page
Building timetable...