Define dates for the installation and commissioning

Zoom Meeting ID
65558309316
Host
Lukas Nies
Useful links
Join via phone
Zoom URL
    • 10:00 10:10
      WP1: Management and Coordination 10m 508/1-001

      508/1-001

      CERN

      20
      Show room on map
      Speakers: Erwin Siesling (CERN), Oliver Aberle (CERN)
    • 10:10 10:25
      PUMA and RC7 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map

      News from PUMA

      Speakers: Mark Julian Kirschbaum (CERN, Technische Universitaet Darmstadt (DE)), et al.
      • Major installation advancements at AD -> Magnet is now cooling down, it is planned to take Antiprotons in March when AD is back and running again
      • ECR for RC7 (PUMA at ISOLDE experimental area) now ready to be shared in engineering check
      • PUMA installation planning at ISOLDE: transport planned with Antiprotons or electrons planned for second half of the year, RC7 will start construction at ISOLDE in Spring to anticipate transport later in the year 
      • Transport still needs production of load spreader -> needs to be announced at least 3 months in advance; needs also preparing the Diesel generators and renting of the special truck 
      • Concerns by VSC: only time for support until July (start of LS3), afterwards will be very tight on ressources 
      • Mark will send Vincent the final RC7 layout to be integrated 
    • 10:25 10:40
      WP6: BEAM optics and elements; AOBs 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speakers: Lukas Nies (CERN), Magdalena Kowalska (CERN)
      • No survey possible in July and August
    • 10:40 10:55
      WP2: The RC6 beam line 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speakers: Pablo Arrutia (CERN), et. al.
    • 10:55 11:10
      WP3: Vacuum 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speakers: Alice Ingrid Michet (CERN), Dr Jose Antonio Ferreira Somoza (CERN)
      • Birst DB box failed vacuum acceptance test, will have to be cleaned again
      • Some delay for one of the drift tubes that needs NEG coating: can also operate for now without coating which could be done later
      • VSC installation should be done before beginning of July when the LS3 starts 
      • Very first part (first quadrupole until valve) could be installed anytime; bottlenecks for downstream parts are the installation of the beam telescopes and the first BI box 
    • 11:10 11:25
      WP4: Beam instrumentation 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speakers: Chiara Pasquino (CERN), Federico Roncarolo (CERN), Miguel Martin Nieto (CERN)
      • First box failed vacuum testing: back to cleaning -> possible delivery beginning of April
      • Racks and FECs are installed on the Mezzannine
      • Initial FESA class ready and expert application supplied
    • 11:25 11:40
      WP5: Handling and transport 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speaker: Roberto Rinaldesi (CERN)
    • 11:40 11:55
      Not covered by the WPs 15m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map

      Cabling, racks, IT, Timing, Software
      Survey

      Speakers: Antje Behrens (CERN), Ioan Kozsar (CERN), Nicolas Chritin (Unknown), Patrick Rene Gallay (CERN)
    • 11:55 12:05
      Summay and outlook 10m 37/R-022 - 37/R-022

      37/R-022 - 37/R-022

      CERN

      25
      Show room on map
      Speaker: Oliver Aberle (CERN)