-
Alessandro Lapertosa (Universita e INFN, Catania (IT))30/09/2026, 11:20Production - Production, Testing and ReliabilityOral
Silicon pixel modules developed for the Phase2 CMS Inner Tracker were tested at HiRadMat facility, CERN, to evaluate potential damage in case of accidental beam loss at HL-LHC. Four pixel modules equipped with RD53 CROCv2 ASIC were exposed to fast and high intensity pulses of 440 GeV protons from SPS. The intensity of pulses was increased step-by-step: single bunch with increasing intensity up...
Go to contribution page -
Patryk Semeniuk (AGH University of Krakow (PL), Goethe University Frankfurt (DE), GSI Helmholtzzentrum für Schwerionenforschung GmbH (DE))30/09/2026, 11:40Production - Production, Testing and ReliabilityOral
The Silicon Tracking System (STS) of the CBM experiment at FAIR requires a compact, high throughput readout architecture capable of operating at interaction rates up to 10 MHz. The STS Readout Board (STS-ROB), based on GBTx ASICs and Versatile Link optical interfaces, implements the data aggregation stage between front-end electronics and the back-end data acquisition system. The final...
Go to contribution page -
Ioannis Mesolongitis (University of West Attica (GR))30/09/2026, 12:00Production - Production, Testing and ReliabilityOral
Abstract —
Go to contribution page
A mass-production tester was developed for the RPC DCT boards of the ATLAS Phase-II upgrade, covering both legacy BM/BO and new BI detector variants. The system validates complete board functionality during prototype, pre-production, and forthcoming production phases. It emulates the RPC Sector Logic interface and 288 front-end hit inputs using representative 1 MHz, 12.5 ns pulses.... -
Hancen Lu01/10/2026, 09:00Production - Production, Testing and ReliabilityOral
ALTIROC-A is the front-end readout ASIC of the ATLAS High-Granularity Timing Detector (HGTD). Its large-scale production requires reliable wafer-level screening before dicing and module assembly. This contribution presents the ALTIROC-A wafer probing campaign, focusing on measured performance, including TDC and jitter characterization, wafer-to-wafer yield spread, and the constraints relevant...
Go to contribution page -
Theresa Alexandra Goldschmidt (University of Zurich (CH))01/10/2026, 09:20Production - Production, Testing and ReliabilityOral
The High-Luminosity LHC(HL-LHC) will reach instantaneous luminosities
Go to contribution page
up to $7.5\times10^{34},cm^{-2}s^{-1}$. The CMS Inner Tracker will be replaced to handle higher data rates, increased radiation, and finer
granularity. The new Inner Tracker(IT) uses hybrid modules based on RD53 65nm CMOS ASICs, bump-bonded to silicon sensors with a pixel size of $25\times100,\mu\text{m}$ and operated in... -
Tiankuan Liu (Brookhaven National Laboratory (US))01/10/2026, 09:40Production - Production, Testing and ReliabilityOral
ALFE2 is a front-end ASIC designed for the ATLAS Liquid Argon Calorimeter (LAr) in the High-Luminosity Large Hadron Collider (HL-LHC) upgrade. It integrates four channels of preamplifiers and shapers, each with two distinct gain outputs that can be read out in parallel to cover a 16-bit dynamic range. Over 80,000 chips have been fabricated in a 130 nm CMOS process. A robotic system performs...
Go to contribution page -
Cecilia Borca (Universita e INFN Torino (IT))01/10/2026, 11:20Production - Production, Testing and ReliabilityOral
Upgrading the CMS ECAL barrel for the HL-LHC requires replacement of all on-detector electronics, including 12,240 Very-Front-End (VFE) cards employing CATIA and LiTE-DTU ASICs for amplification and digitization of signals from ECAL’s 61,200 lead-tungstate crystals.
Go to contribution page
All production VFEs undergo the same qualification procedure: functional testing, environmental stress screening, and... -
Jie Yi (Central China Normal University CCNU (CN))01/10/2026, 11:40Production - Production, Testing and ReliabilityOral
The Bergen pCT collaboration is building a prototype Digital Tracking Calorimeter for clinical proton-therapy use. Quality assurance of the ALPIDE assemblies is performed with a Production Test Box in a joint LTU Kharkiv and University of Bergen (UiB) workflow. The assembly procedure uses chip cables and two qualification stages at LTU: chip tests after bonding to the chip cable, and repeated...
Go to contribution page -
Dr Dima Maneuski (University of Glasgow (GB))01/10/2026, 12:00Production - Production, Testing and ReliabilityOral
ATLAS Inner Tracker (ITk) pixel module production is underway and scheduled for completion in Q2 2027. The detector will cover about 13 m² of active area and include roughly 9,400 quad and triplet modules. Ahead of production, nearly 93,000 readout chips were fabricated and individually qualified to meet stringent ITk requirements. This contribution summarises experience gained in developing...
Go to contribution page -
Stefano Caregari (Massachusetts Inst. of Technology (US))01/10/2026, 15:20Production - Production, Testing and ReliabilityOral
Next-generation pixel detectors for high-energy physics rely on high-speed links exceeding 10 Gbps, making efficient and reliable production quality control (QC) a critical challenge. This work introduces a high-speed wafer-level testing approach based on vertical probe card technology, enabling multi-Gbps validation directly at wafer-level. Test results obtained on MOSAIX, a MAPS developed...
Go to contribution page -
Luise Poley (Simon Fraser University (CA))01/10/2026, 15:40Production - Production, Testing and ReliabilityOral
The replacement of the ATLAS Inner Detector with the new ATLAS Inner Tracker for the LHC High-Luminosity Upgrade will require the assembly of 17,000 silicon strip modules. In preparation for production, scheduled to take place in 30 institutes worldwide over 3.5 years, a pre-production programme was conducted, assembling 5% of the full production quantity. During pre-production, the discovery...
Go to contribution page -
Angelos Zografos (CERN)01/10/2026, 16:00Production - Production, Testing and ReliabilityOral
This contribution reports two unexpected findings from ATLAS ITk Outer Barrel production and testing with consequences for QC and detector operation. A module-cell isolation defect, due to weaknesses in the original loaded local support (LLS) design, showed an unusual electrical signature that was studied with dedicated measurements to define automatic detection criteria. In addition, a...
Go to contribution page
Choose timezone
Your profile timezone: