- Michal
- safety visit of lab b1 on Monday (19.10.)
- try to use James (electrical safety) to put some pressure to finish the lab (AC, heating, ...)
- Zdenko
- GDD lab (flammable gasses) b154
- we need to provide copper pipe for gas connection
- connection between copper pipe and gas manifold need to be APEX safe - possible with current design?
- need to prepare a welded cover box for the prototype (design, manufacturing)
- wire tension measurement - short prototype
- 2 straws may need to be replaced and/or rewired
- next: intermediate prototype
- attenuation measurement - short prototype
- strange features to be understood