Conveners
Organizations and their A&MM methods
- Goran Perinic (CERN)
-
Christophe Mugnier (CERN)13/11/2013, 11:40CERN accelerator complex and injector chain have entered since a few years an operation dominated phase during which getting maintenance right is one of the key factors for increasing the accelerator availabilities and reducing downtimes. Four CERN departments have identified common needs in the area of maintenance management and have put into place at the end of 2011 a transversal project...Go to contribution page
-
Mrs Hélène Rozelot (Soleil), Mrs Isabelle Leconte (ESRF), Mr Nick Balshaw (CCFE)13/11/2013, 12:00
-
David Carles (C), Mr Jean-Luc Rostoucher (GVA), Jens-Peter Jensen (DESY), Mr Julian Brower (ISIS), Mrs Kitty Fritz-Nielen (XFEL), Mrs Sara Thorin (MAX IV Lab)13/11/2013, 14:00
-
Xavier Deletoille (Synchrotron Soleil)13/11/2013, 15:00Practical maintenance managementOral - 30 min.SOLEIL is a third generation synchrotron light source located near Paris (France) in operation since 2007. In constant progress, the number of beam operation hours scheduled in 2012 has reached 6 512 which 5341 hours were planned for the beamlines. With a goal of 99% of photon beam availability and a mean time between failure of 100 hours, we have set up procedures (organized around work...Go to contribution page
-
Pascale Betinelli (Synchrotron Soleil)13/11/2013, 15:15Asset and maintenance management toolsOral - 15 min.SOLEIL is a third generation Synchrotron source located near Paris (France) in operation since 2007. During the first maintenance and reliability workshop in November 2011, we presented our experience and issues with CMMS in SOLEIL. There was a lot of competition between tools and the commitment around the CMMS tool was difficult. For the last two years there have been some changes. First of...Go to contribution page
-
Juan José Manotas (CELLS - ALBA)13/11/2013, 15:30Asset and maintenance management strategiesOral - 30 min.After two years of successful exploitation with external users at ALBA synchrotron the current preventive maintenance approach is giving excellent results with high rate availabilities. An accelerator maintenance singularity is the conjunction of a high complex conventional facility with an intrinsic dynamically changing scientific environment. The dense preventive maintenance program...Go to contribution page
-
Mr Antonio Camps (CELLS - ALBA)13/11/2013, 15:45Oral - 15 min.After two years of successful exploitation with external users at ALBA synchrotron the current preventive maintenance approach is giving excellent results with high rate availabilities. An accelerator maintenance singularity is the conjunction of a high complex conventional facility with an intrinsic dynamically changing scientific environment. The dense preventive maintenance program...Go to contribution page