WP6

13 Nov 2013, 09:00
Daresbury Laboratory

Daresbury Laboratory

Presentation materials

There are no materials yet.

  1. Amalia Ballarino (CERN)
    13/11/2013, 09:00
    • Update on CERN activities • Baseline Powering Layout for Triplets • Baseline HTS Link configuration for Triplets • Baseline cryogenic consumption of powering devices (leads and link) • Plan for future activities and open issues
    Go to contribution page
  2. Udo Wagner (CERN)
    13/11/2013, 09:30
    Cryogenics for the cold powering systems in LHC P7 • Given boundary conditions, mechanical, lay-out and process,… • Retained solution for the cryogenic circuit • Influence on the performance of the existing LHC refrigerators • List of items do be defined, designed, build and installed • List of open questions
    Go to contribution page
  3. Udo Wagner (CERN)
    13/11/2013, 09:50
    Cryogenics for the cold powering systems in LHC P1 and P5 • Given boundary conditions, mechanical, lay-out and process, • Overview of considered cooling solutions for the cryogenic circuit • Influence on the energy consumption • List of open questions
    Go to contribution page
  4. Yifeng Yang (University of Southampton)
    13/11/2013, 10:55
    • Thermo-electrical modelling of HTS Link for Triplets • Progress on conceptual design of Distribution Feed-Box • Plan for future activities
    Go to contribution page
  5. Jean-Pierre Corso (CERN), Sylvain Weisz (CERN)
    13/11/2013, 12:00
    • Status of integration of SC-Link system at P7 • Status of integration of SC-Link System at P1 and P5 - Triplets • Open issues, request for inputs from project, plan….
    Go to contribution page
  6. Yifeng Yang (University of Southampton)
    13/11/2013, 14:00
    Thermo-electrical models of SC links
    Go to contribution page
  7. 13/11/2013, 15:00
    Interface issues and request for input from other tasks, plan for future activities. Milestones. Status of deliverables: • Task 1 (A. Ballarino) • Task 2 (U. Wagner) • Task 3 (Y. Yang) • Task 3 (F. Broggi)
    Go to contribution page
Building timetable...