Indico celebrates its 20th anniversary! Check our blog post for more information!

28 June 2015 to 2 July 2015
JW Marriott Starr Pass Resort
Etc/GMT-7 timezone

First results from the Cornell high Q cw full linac cryo-module

29 Jun 2015, 16:15
15m
Tucson Ballroom GH

Tucson Ballroom GH

Contributed Oral Presentation CEC-07 - Superconducting RF Systems C1OrG - Superconducting RF Systems I

Speaker

Ralf Eichhorn (Cornell University)

Description

Cornell University has finished building a 10 m long superconducting accelerator module as a prototype of the main linac of a proposed ERL facility. This module houses 6 superconducting cavities- operated at 1.8 K in continuous wave (CW) mode - with individual HOM absorbers and one magnet/ BPM section. In pushing the limits, a high quality factor of the cavities (2•10^10) and high beam currents (100 mA accelerated plus 100 mA decelerated) were targeted. We will review the design shortly and present the results of the components tested before the assembly. The main focus of the paper will be on preparation of the first cool-down, being scheduled by the time of the conference.

Primary author

Ralf Eichhorn (Cornell University)

Co-authors

Dan Sabol (Cornell University) Dr Eric Smith (Cornell University) Georg Hoffstaetter (Cornell University) James Sears (Cornell University) Peter Quigley (Cornell University) Tim O'Connel (Cornell Uniersity)

Presentation materials