21–25 Jul 2019
Connecticut Convention Center, Level 6
US/Eastern timezone

C1Or2A-05: Stable Operation of Cryogenic System at 2K during the RF or Magnet Power Variations

22 Jul 2019, 17:00
15m
Level 6, Room 26-27

Level 6, Room 26-27

Speaker

Dr Sergiy Putselyk (FHR)

Description

In the last decades, several laboratories, like CERN, DESY, CEBAF, constructed the accelerators with large number of superconducting (sc) cavities or magnets operating at 2 or 4K temperature levels. Other accelerators, e.g. at GSI/FAIR, SLAC, MSU, ESS are under construction. Typically, the operation of sc cavity requires narrower ranges of pressure variation than ones of sc magnets. For large accelerators a complicated controlling of refrigerator and cryogenic system is required, which requires more elaborated design in comparison to small testing benches or single cavities modules. A review of controlling principles and loops, typically applied for the controlling of liquid helium level and pressure for large accelerators is presented. Other possible control loops, e.g. cascade control or multivariable feed-back (or with feed-forward option), are discussed. Activities, which are required for the commissioning of control loops and supporting measurements, are also mentioned. Supplementary measurements on thermal equilibration time constant between gaseous and liquid superfluid helium are also presented.

Primary author

Presentation materials

There are no materials yet.