21–25 Jul 2019
Connecticut Convention Center, Level 6
US/Eastern timezone

C3Po1A-02 [23]: The new dynamic synthesis PID control for the 1.3 GHz LCLS-II Cryomodule test at Fermilab

24 Jul 2019, 09:00
2h
Level 6, Cryo Expo Exhibit Hall

Level 6, Cryo Expo Exhibit Hall

Speaker

Liujin Pei (Fermi National Accelerator Laboratory)

Description

The 1.3GHz LCLS-II Cryomodule (CM) has 8 cavities and each cavity has 9 RF cells and a 50W heater. The1.3GHz LCLS-II CM is 12.2-meter-long and contains a total 241.3 liters (equivalent liquid) of liquid helium, which is filling up by the 4KW@2.0K cryogenic plant at the Fermilab Cryomodule Test Facility (CMTF). A new dynamic synthesis PID control of 2K cryogenic control system is built to control the large time-lagged unstable CM cryogenic system, under different modes operations. A report on the results obtained from the dynamic synthesis PID control algorithm in the CMTF 1.3GHz CM test will be presented.
Index: large time lagged, unstable cryogenic control system, new dynamic synthesis PID control algorithm

Primary author

Liujin Pei (Fermi National Accelerator Laboratory)

Co-authors

Mr Benjamin Hansen (Fermilab) Jay Theilacker (Fermilab) Mr Qing Pei (Fermilab)

Presentation materials