Preparation of the H2/H4 beam line for 2021 operation
o Half in parallel with NA61, half in parallel with FASER and ATLAS FCAL PULSE in H2.
o A bend of 110 mm - without vacuum inside to be installed in PPE172
70 units on T2
o Primary (400 GeV/c) beam
o A bend of 110 mm - without vacuum inside to be installed in PPE172