08:30
|
Operation and maintenance
(until 10:40)
()
|
08:30
|
Introduction to the Workshop
-
Scaramelli, A
()
|
08:40
|
Operation and maintenance in CV
-
Bangert, N
()
|
09:00
|
Opération et maintenance ST-EL jusqu'où externaliser en conservant la maîtrise ?
-
Jean-Yves
(CERN)
()
|
09:20
|
Operation and Maintenance in MA
-
Cennini, E Nunes, R
()
|
09:40
|
E072/ST-HM - A dynamic maintenance strategy to meet the requirements of the LHC installation
-
Jean-Yves
(CERN)
()
|
10:00
|
Operation and Maintenance in the FM group
-
Jean-Yves
(CERN)
()
|
10:20
|
MP5 Status report
-
Vercoutter, B.
()
|
10:40
|
Break
(until 11:10)
()
|
11:10
|
Operation and Maintenance II
(until 12:40)
()
|
11:10
|
L'avis d'ouverture de chantier informatisé: Un moyen de prévention et de management
-
Jacot, C; Sanchez-Corral Mena, E.
()
|
11:30
|
Actions for the environment
-
Jean-Yves
(CERN)
()
|
11:50
|
The first year of the ST operation committee. Is there a future?
-
Jean-Yves
(CERN)
()
|
12:10
|
Collaboration entre les divisions TIS et ST en matière de sécurité "opération et maintenance"
-
Trant, R.; Vojtyla, P.
()
|
|
08:30
|
LHC Construction I
(until 09:50)
()
|
08:30
|
CV Installation works for the LHC
-
Martel, C.; Pirollet, B.
()
|
08:50
|
Civil engineering status report for the atlas & cms worksites
-
Osborne, J.; Rammer, H.
()
|
09:10
|
HM works for the LHC
-
Pelletier, S.
()
|
09:30
|
The organization and on-site follow-up of the electrical installation work for the LHC
-
Jean-Yves
(CERN)
()
|
09:50
|
Poster Session. LHC Installation
(until 10:50)
()
|
09:50
|
Comparaison des procedes d'excavation des tunnels TI8 et TI2 du projet LHC
-
Jean-Yves
(CERN)
()
|
09:50
|
Cooling process of the LHC energy extraction resistors
-
Jean-Yves
(CERN)
()
|
09:50
|
Modification of the electrical installation in point 8
-
Pierlot, J.
()
|
09:50
|
Process control migration towards LHC ventilation functionality
-
Blanc, D.
()
|
09:50
|
Retendering of ST-CV maintenance contract
-
Battistin, M.
()
|
10:50
|
LHC Installation
(until 12:30)
()
|
10:50
|
TCR system monitoring or TCR remote monitoring for the LHC technical infrastructure
-
Blanc, D; Epting, U; Morodo Testa, MC; S. Poulsen
()
|
11:10
|
Summary of ST/MA deliverables for LHC
-
Scibile, L.
()
|
11:30
|
Logistique de transport pour le projet LHC: Enseignements des premiers secteurs
-
Prodon, S.; Weisz, S.
()
|
12:00
|
Planning et coordination de l'installation du LHC
-
Colloca, C.;Foraz, K.
()
|
|
08:30
|
Projects
(until 09:45)
()
|
08:30
|
Outsourced design services lessons learned from LHC civil engineering
-
Watson, T.
()
|
08:45
|
Project working methods; the use of blanket contracts
-
Jean-Yves
(CERN)
()
|
09:00
|
Project management by CV; insourcing the design
-
Jean-Yves
(CERN)
()
|
09:15
|
The "right-sourcing" or the correct balance between in-house activity and the purchase of external services
-
Jean-Yves
(CERN)
()
|
09:30
|
ST-HM design section - strategy and working methods
-
Jean-Yves
(CERN)
()
|
09:45
|
Discussion. Projects strategy
(until 10:15)
()
|
10:15
|
Projects
(until 10:40)
()
|
10:15
|
Les obligations réglementaires en matière de coordination de sécurité : application par les divisions TIS et ST pour les contrats de catégorie 2
-
Pividori, C.
()
|
10:35
|
Break
(until 11:05)
()
|
11:05
|
Consolidation
(until 12:30)
()
|
11:05
|
Added value of the SPL division
-
Lagrange, T.
()
|
11:25
|
Consolidation Civil engineering and technical infrastructure for tertiary buildings
-
Alves, P.; Nonis, M.; Pepinster, P.; Van Baaren, W.
()
|
11:40
|
Consolidation Civil engineering and technical infrastructure for the accelerators
-
Battistin, Cennini, E.; M.; Pedersen, J.; Ruehl, I.; Wilhelmsson, M.
()
|
11:55
|
LHC technical coordination
-
Proudlock, P.
()
|
12:15
|
EVM in ST
-
Bejar Alonso, I.
()
|
|
14:20
|
Discussion. Operation and maintenance
(until 15:30)
()
|
15:30
|
Experiments I
(until 16:00)
()
|
15:30
|
Alice : Progress and Plans
-
Fabjan, C.
()
|
16:00
|
Poster session. Experiments
(until 17:00)
()
|
16:00
|
Nouvelles technologies appliques à la sécurité
-
Grau, S.; D. Raffourt
()
|
16:00
|
Réutilisation des demies culasses d'aimants dipoles du LEP
-
Jean-Yves
(CERN)
()
|
16:00
|
The construction and transport of the ATLAS experiment components
-
Jean-Yves
(CERN)
()
|
16:00
|
The performance of the new sps reactive power compensator
-
Jean-Yves
(CERN)
()
|
16:00
|
Use of perfluorocarbons for the cooling of LHC experiments
-
Pimenta dos Santos, M.
()
|
17:00
|
Experiments I
(until 18:00)
()
|
17:00
|
The LHC experiments as seen from the technical sector
-
Inigo Golfin, J.; Principe, R.
()
|
17:20
|
CMS
-
Herve, A.
()
|
17:00
|
Experiments II
(until 18:10)
()
|
17:00
|
Distributed cryogenic cooling with miniaturized fluid circuits
-
Jean-Yves
(CERN)
()
|
17:20
|
Cryoinstallation for the LHC
-
Tavian, L.
()
|
17:40
|
LHCB
-
Witzeling, W.
()
|
|
14:20
|
Discussion. LHC Installation
(until 15:30)
()
|
15:30
|
Experiments II
(until 16:00)
()
|
15:30
|
ATLAS
-
Nessi, M.
()
|
16:00
|
Poster session + Industrial exchange
(until 17:00)
()
|
16:00
|
Constructions and installations for LHC
-
Calderone, A; Roche, G.
()
|
16:00
|
Contribution of thermofluid analyses to the LHC experiments
-
Jean-Yves
(CERN)
()
|
|
14:30
|
Physics
(until 15:50)
()
|
14:30
|
Isolde Physics
-
Lindroos, M.
()
|
15:10
|
CNGS Physics
-
Jean-Yves
(CERN)
()
|
15:50
|
Break + Poster award
(until 16:20)
()
|
16:20
|
Physics
(until 18:00)
()
|
16:20
|
Anti H2
-
Landua, R.
()
|
17:00
|
Status of the SPL Project
-
Garoby, R.
()
|
17:40
|
Workshop conclusions
-
Scaramelli, A.
()
|
|