6th ST Workshop

from Tuesday 1 April 2003 (08:30) to Thursday 3 April 2003 (18:00)
Holiday Inn Thoiry

        : Sessions
    /     : Talks
        : Breaks
1 Apr 2003
2 Apr 2003
3 Apr 2003
AM
08:30
Operation and maintenance (until 10:40) ()
08:30 Introduction to the Workshop - Scaramelli, A   ()
08:40 Operation and maintenance in CV - Bangert, N   ()
09:00 Opération et maintenance ST-EL jusqu'où externaliser en conservant la maîtrise ? - Jean-Yves (CERN)   ()
more information
more information
more information
09:20 Operation and Maintenance in MA - Cennini, E Nunes, R   ()
09:40 E072/ST-HM - A dynamic maintenance strategy to meet the requirements of the LHC installation - Jean-Yves (CERN)   ()
10:00 Operation and Maintenance in the FM group - Jean-Yves (CERN)   ()
10:20 MP5 Status report - Vercoutter, B.   ()
10:40
Break (until 11:10) ()
11:10
Operation and Maintenance II (until 12:40) ()
11:10 L'avis d'ouverture de chantier informatisé: Un moyen de prévention et de management - Jacot, C; Sanchez-Corral Mena, E.   ()
11:30 Actions for the environment - Jean-Yves (CERN)   ()
11:50 The first year of the ST operation committee. Is there a future? - Jean-Yves (CERN)   ()
transparencies
12:10 Collaboration entre les divisions TIS et ST en matière de sécurité "opération et maintenance" - Trant, R.; Vojtyla, P.   ()
more information
more information
08:30
LHC Construction I (until 09:50) ()
08:30 CV Installation works for the LHC - Martel, C.; Pirollet, B.   ()
transparencies
08:50 Civil engineering status report for the atlas & cms worksites - Osborne, J.; Rammer, H.   ()
09:10 HM works for the LHC - Pelletier, S.   ()
09:30 The organization and on-site follow-up of the electrical installation work for the LHC - Jean-Yves (CERN)   ()
09:50
Poster Session. LHC Installation (until 10:50) ()
09:50 Comparaison des procedes d'excavation des tunnels TI8 et TI2 du projet LHC - Jean-Yves (CERN)   ()
09:50 Cooling process of the LHC energy extraction resistors - Jean-Yves (CERN)   ()
09:50 Modification of the electrical installation in point 8 - Pierlot, J.   ()
09:50 Process control migration towards LHC ventilation functionality - Blanc, D.   ()
transparencies
09:50 Retendering of ST-CV maintenance contract - Battistin, M.   ()
10:50
LHC Installation (until 12:30) ()
10:50 TCR system monitoring or TCR remote monitoring for the LHC technical infrastructure - Blanc, D; Epting, U; Morodo Testa, MC; S. Poulsen   ()
11:10 Summary of ST/MA deliverables for LHC - Scibile, L.   ()
11:30 Logistique de transport pour le projet LHC: Enseignements des premiers secteurs - Prodon, S.; Weisz, S.   ()
12:00 Planning et coordination de l'installation du LHC - Colloca, C.;Foraz, K.   ()
08:30
Projects (until 09:45) ()
08:30 Outsourced design services lessons learned from LHC civil engineering - Watson, T.   ()
08:45 Project working methods; the use of blanket contracts - Jean-Yves (CERN)   ()
09:00 Project management by CV; insourcing the design - Jean-Yves (CERN)   ()
09:15 The "right-sourcing" or the correct balance between in-house activity and the purchase of external services - Jean-Yves (CERN)   ()
09:30 ST-HM design section - strategy and working methods - Jean-Yves (CERN)   ()
09:45
Discussion. Projects strategy (until 10:15) ()
10:15
Projects (until 10:40) ()
10:15 Les obligations réglementaires en matière de coordination de sécurité : application par les divisions TIS et ST pour les contrats de catégorie 2 - Pividori, C.   ()
10:35
Break (until 11:05) ()
11:05
Consolidation (until 12:30) ()
11:05 Added value of the SPL division - Lagrange, T.   ()
11:25 Consolidation Civil engineering and technical infrastructure for tertiary buildings - Alves, P.; Nonis, M.; Pepinster, P.; Van Baaren, W.   ()
transparencies
11:40 Consolidation Civil engineering and technical infrastructure for the accelerators - Battistin, Cennini, E.; M.; Pedersen, J.; Ruehl, I.; Wilhelmsson, M.   ()
11:55 LHC technical coordination - Proudlock, P.   ()
12:15 EVM in ST - Bejar Alonso, I.   ()
PM
14:20
Discussion. Operation and maintenance (until 15:30) ()
15:30
Experiments I (until 16:00) ()
15:30 Alice : Progress and Plans - Fabjan, C.   ()
16:00
Poster session. Experiments (until 17:00) ()
16:00 Nouvelles technologies appliques à la sécurité - Grau, S.; D. Raffourt   ()
more information
more information
more information
16:00 Réutilisation des demies culasses d'aimants dipoles du LEP - Jean-Yves (CERN)   ()
16:00 The construction and transport of the ATLAS experiment components - Jean-Yves (CERN)   ()
16:00 The performance of the new sps reactive power compensator - Jean-Yves (CERN)   ()
16:00 Use of perfluorocarbons for the cooling of LHC experiments - Pimenta dos Santos, M.   ()
17:00
Experiments I (until 18:00) ()
17:00 The LHC experiments as seen from the technical sector - Inigo Golfin, J.; Principe, R.   ()
17:20 CMS - Herve, A.   ()
17:00
Experiments II (until 18:10) ()
17:00 Distributed cryogenic cooling with miniaturized fluid circuits - Jean-Yves (CERN)   ()
transparencies
video
17:20 Cryoinstallation for the LHC - Tavian, L.   ()
17:40 LHCB - Witzeling, W.   ()
14:20
Discussion. LHC Installation (until 15:30) ()
15:30
Experiments II (until 16:00) ()
15:30 ATLAS - Nessi, M.   ()
16:00
Poster session + Industrial exchange (until 17:00) ()
16:00 Constructions and installations for LHC - Calderone, A; Roche, G.   ()
16:00 Contribution of thermofluid analyses to the LHC experiments - Jean-Yves (CERN)   ()
14:30
Physics (until 15:50) ()
14:30 Isolde Physics - Lindroos, M.   ()
15:10 CNGS Physics - Jean-Yves (CERN)   ()
15:50
Break + Poster award (until 16:20) ()
16:20
Physics (until 18:00) ()
16:20 Anti H2 - Landua, R.   ()
17:00 Status of the SPL Project - Garoby, R.   ()
17:40 Workshop conclusions - Scaramelli, A.   ()