27 August 2017 to 1 September 2017
RAI Congress Center, Amsterdam, The Netherlands
Europe/Amsterdam timezone

Cable-in-Conduit Dipoles for the Ion Ring of JLEIC

31 Aug 2017, 13:45
1h 45m
Posters Area

Posters Area

Poster Presentation of 1h45m A4 - Fast Cyling Accelerator Magnets Thu-Af-Po4.03

Speaker

Peter McIntyre (Texas A&M University)

Description

The Ion Ring for the proposed Jefferson Lab Electron-Ion Collider require large aperture with high homogeneity, 1 T/s ramping, and significant beam losses. Two designs have been developed, both utilizing a cable-in-conduit (CIC) winding in which liquid helium flows within the conductor. Two alternative designs are being developed, with the same aperture, having maximum operating field of 3(6) T corresponding to 100(200) GeV/u circulating ion beam energy. Particular features are presented, including the CIC fabrication and validation and the fabrication of a first model dipole.

Submitters Country US

Primary authors

Jeff Breitschopf (Texas A&M University) Mr Daniel Chavez (Universidad Guanajuato) James Gerity (Texas A&M University) Mr Joshua Kellams (Accelerator Technology Corp.) Peter McIntyre (Texas A&M University) Dr Akhdiyor Sattarov (Texas A&M University)

Presentation materials