09:00
|
Introdution to the Reliability Run: goals, schedule, organisation
-
Maurizio Vretenar
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
09:20
|
Control of Linac4 from the CCC: status, missing items
-
Jose-Luis Sanchez Alvarez
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
09:40
|
Parameters to be controlled (on line and periodically), alarm thresholds
-
Alessandra Lombardi
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
10:00
|
4. Availability model for LINAC4
-
Odei Rey Orozco
(Universitaet Stuttgart (DE))
(864/2-B14 - SALLE J.B.ADAMS)
|
10:15
|
Fault tracking: modalities and requirements
-
Andrea Apollonio
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
10:30
|
Operation of the ion source during the reliability run, organisation of interventions
-
Jacques Lettry
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
10:45
|
Beam instrumentation availability during the reliability run
-
Federico Roncarolo
(CERN)
Uli Raich
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
11:00
|
RF system operation and interventions during the reliability run
- Dr
Suitbert Ramberger
(CERN)
(864/2-B14 - SALLE J.B.ADAMS)
|
11:20
|
Discussion
(864/2-B14 - SALLE J.B.ADAMS)
|