Session

Production, Testing and Reliability

B
12 Sept 2017, 08:30
Thimann I lecture hall (Other Institutes)

Thimann I lecture hall

Other Institutes

Thimann I lecture hall

Conveners

Production, Testing and Reliability

  • Alex Grillo (University of California,Santa Cruz (US))

Production, Testing and Reliability

  • Philippe Farthouat (CERN)

Presentation materials

There are no materials yet.

  1. Shanshan Gao (Brookhaven National Laboratory)
    12/09/2017, 08:30
    Production, Testing and Reliability
    Oral

    As a prototype of DUNE far detector, ProtoDUNE-SP single phase LAr TPC will sit in H4 beam line at CERN to study detector response to particles. It consists of 6 full-size APAs plus 2 CPAs, with total 15,360 TPC readout channels. The front-end readout electronics is comprised of cold electronics and warm interface electronics. The integral design concept of APA, cold electronics, feed-through,...

    Go to contribution page
  2. Tomasz Gadek (CERN)
    12/09/2017, 08:55
    Production, Testing and Reliability
    Oral

    The upgrade of the CMS Outer Tracker for the HL-LHC requires the design of new double-sensor modules. They contain two high-density front end hybrid circuits, equipped with flip-chip ASICs, passives and mechanical structures. First prototype hybrids in a close-to-final form have been received from three manufacturers. To qualify these hybrids a test setup was built, which emulates future...

    Go to contribution page
  3. Marius Preuten (Rheinisch-Westfaelische Tech. Hoch. (DE))
    12/09/2017, 09:20
    Production, Testing and Reliability
    Oral

    First full size 2S module prototypes for the CMS Phase-2 Tracker Upgrade have been assembled. With two sensors with realistic geometries and 16 CBC2 readout chips on two front-end hybrids, the characteristics of these complex objects can be studied.
    A microTCA based readout system was developed to test multiple front-end hybrids simultaneously. Therefore the concurrent information of the full...

    Go to contribution page
  4. Peter Phillips (STFC - Rutherford Appleton Lab. (GB))
    13/09/2017, 08:30
    Production, Testing and Reliability
    Oral

    The ATLAS ITk is working to deliver a new Inner Tracking detector for use at HL-LHC. The strip tracker community has recently constructed partially loaded, double sided demonstrator staves using the HCC / ABC130 chipset in 130nm CMOS technology. Mindful of the need to maximise power efficiency whilst minimising the cost and material of associated cable plant, the system design includes the...

    Go to contribution page
  5. Pawel Marciniewski (Uppsala University)
    13/09/2017, 08:55
    Production, Testing and Reliability
    Oral

    A compact-size, 64-channel, 80 MSPS, 14-bit dynamic range ADC module for the scintillating electromagnetic calorimeter of PANDA was developed, tested in various detector readout set-ups and are currently in mass production phase. The module performs signal filtration, extract important signal parameters and allow for resolving and parametrizing overlapping pulses. Processed data are pushed to...

    Go to contribution page
  6. Evangelos Gkougkousis (Conseil Europeen Recherche Nucl. (CERN)-Unknown-Unknown)
    13/09/2017, 09:20
    Production, Testing and Reliability
    Oral

    A unified platform combining a low noise 64-channel power supply with environmental monitoring and a high data rate transmission system, rated up to 1.2 Gbps/sec, has been developed for commissioning of the ATLAS ITk silicon strip hybrids. The power supply with 10mV peak-to-peak noise, implements 3kV isolation and software control. Humidity, temperature, voltage and current are monitored for...