Injection and dump protection

20 Jan 2010, 09:50
20m
Hilton and Palais Lumière (EVIAN)

Hilton and Palais Lumière (EVIAN)

Speaker

Wolfgang BARTMANN

Description

Results will be shown from the low-intensity beam commissioning of first, the moveable injection protection devices in the SPS to LHC transfer lines and downstream of the LHC injection kicker and second, the LHC dump protection elements in IR6. The implications of these results and a commissioning status report with the further planning will be addressed.

Summary

Performance, measurements vs. expectations, problems encountered, is related software sufficient, necessary improvements, appropriate for 3.5TeV running?