26–28 Aug 2019
CERN
Europe/Zurich timezone

Mandate of the review:

The main objective is to review the alignment solutions foreseen for HL-LHC, with a focus on the internal metrology, the monitoring of inner triplet cold masses and crab cavities inside their cryostat and full remote alignment systems.

Scope of the review:

The scope of this review is:

  • To examine the soundness of the proposed solutions individually and as a global system;
  • To verify that all requirements from equipment owners and machine operation are duly covered;
  • To check that the interfaces between WP15.4 and the other WPs are clear;
  • To check the readiness of the solutions proposed and evaluate the associated risk if any;
  • To evaluate the related test plan, acceptance criteria and the overall schedule;
  • To examine the procurement strategy, identifying possible risks;
  • To put in evidence possible integration issues and safety aspects.

Review Panel members: Georg Gassner (SLAC, Chairman), Johannes Prenting (DESY), Jean-Philippe Tock (CERN) and Jorg Wenninger (CERN).

Scientific secretary: Mark Jones

Review link persons: Hélène Mainaud Durand and Paolo Fessia.

Dates and Place: The review is scheduled from 26 August to 28 August 2019 at CERN, room 30/7-018.

Charges: See attached document.