Alignment analysis of the RFD prototype during cold test (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
Alignment analysis on the low-beta quadrupoles during cold test (in session "WP2/WP3/WP19 - Thursday AM")
Alignment of TAXS and VAX 20'+10' (in session "WP8/WP12 - Operational aspects of TAXS region - Tuesday PM")
Beam loss limitations: overview and proposal of changes (in session "WP13 - Wednesday AM Part 1")
Canada RFD CM series challenges – procurements and schedule (in session "WP4 - Wednesday PM")
Cavity Specification drawings / Metrology (in session "WP4 - Discussion - Tuesday PM")
CC-PU specification update (in session "WP2/WP4")
Civil engineering wrap up and status on tech. infra. (in session "Plenary session 1 - Tuesday PM")
Collimation MD results (in session "WP2/WP5/WP7")
Collimation performance aspects of HL (tight and relaxed settings, round and flat optics) (in session "WP2/WP5/WP7/WP10")
Collimator impedance measurements (in session "WP2/WP5/WP7")
Collimators production strategy and implementation (in session "WP5/WP7/WP14")
Controls and software for the HWC and operation of the IT String (in session "WP16 - Wednesday AM Part 1")
Crab cavities cryogenics – status and perspective (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
Crab cavity frequency tuner & challenges (in session "WP4 - Wednesday AM Part 1")
Cryo magnet installation into the IT String (in session "WP16 - Wednesday AM Part 2")
Cryogenics : status and perspective towards installation (in session "Plenary session 1 - Tuesday AM")
Damage of sc. sample coils due to beam impact (in session "WP5/WP7/WP14")
Discussion (in session "WP4 - Thursday AM")
Discussion (in session "WP4 - Tuesday AM")
Discussion - Cryomodules (in session "WP4 - Wednesday PM")
DQW & RFD HOM couplers fabrication challenges (in session "WP4 - Wednesday AM Part 2")
DQW industrial production challenges (in session "WP4 - Wednesday AM Part 1")
DQW series cavity testing (in session "WP4 - Wednesday AM Part 1")
Dynamic aperture of the new HL-LHC baseline (in session "WP2/WP5/WP7/WP10")
Effects of pre-loading on magnet performance in MQXFS model magnets (in session "WP3 - Cold powering tests - Tuesday PM")
Electrical Quality Assurance of the HL-LHC (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Engineering issues for the RFD CM production at TRIUMF (in session "WP4 - Discussion - Tuesday PM")
Engineering specifications for HL-LHC WP4: status and open discussion (in session "WP4 - Discussion - Tuesday PM")
Expected performance of the new BPM system in IP1/5 (in session "WP13 - Wednesday AM Part 2")
Experience on NCRs & future expectations (in session "WP4 - Tuesday AM")
Experience with WP6B equipment operation in the HL-LHC IT String (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Field quality updates, including integral gradient and voltage spikes, Nb3Sn (in session "WP2/WP3 - Wednesday AM")
Field quality updates, NbTi (in session "WP2/WP3 - Wednesday AM")
Final design of the luminosity monitor in TAXN and experience with prototype detectro during Run3 (in session "WP13 - Wednesday AM Part 2")
From HWC of the IT String to the HWC of the HL-LHC: status and preparation (in session "WP16 - Wednesday AM Part 1")
Halo studies including hierarchy breakage (in session "WP2/WP5/WP7/WP10")
High intensity MDs and operational experience (in session "WP2/WP5/WP7/WP10")
HL-LHC Baseline and TCC summary (in session "Plenary session 1 - Tuesday AM")
HL-LHC BLM system development status update (in session "WP13 - Wednesday AM Part 1")
HL-LHC Project status (in session "Plenary session 1 - Monday AM")
HL-LHC radiation level studies and specification document (in session "WP2/WP5/WP7/WP10")
Horizontal test results of LQXFA/B02 and plans for testing LQXFA/B03 (in session "WP3 - Cold powering tests - Tuesday PM")
Impact of mechanical and magnetic measurements for performance estimates (in session "WP2/WP3/WP19 - Thursday AM")
Integrated luminosity of the new HL-LHC baseline (in session "WP2/WP5/WP7")
Interface specification 20'+10' (in session "WP8/WP12 - Operational aspects of TAXS region - Tuesday PM")
IST and SCT in the IT String: results (in session "WP16 - Wednesday AM Part 2")
IT String planning and installation status (in session "Plenary session 1 - Monday PM")
Lessons learned from LHC optics control in view of HL-LHC (in session "WP2/WP5/WP7")
LHC longitudinal impedance measurement through Schottky spectra (in session "WP2/WP4")
LHC longitudinal impedance studies (in session "WP2/WP4")
LHC RF power studies & MD results (in session "WP2/WP4")
LHC Run 3: achievements and lessons learned (in session "Plenary session 1 - Monday AM")
Linear imperfections of D2 FQ: impact and correction strategies (in session "WP2/WP3 - Wednesday AM")
LLRF & Controls (in session "WP4 - Wednesday AM Part 2")
LS3 installation plans and equipment readiness (in session "Plenary session 1 - Tuesday AM")
Magnetic axis (in session "WP2/WP3/WP19 - Thursday AM")
Magnetic center alignment results (in session "WP3/WP16 - Wednesday PM")
MCBXF coil and components production at CIEMAT (in session "Plenary session 2 - Monday AM")
MCBXF magnet assembly and powering tests results at CERN (in session "Plenary session 2 - Monday AM")
MCF activities related to magnet circuit instrumentation (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Mechanical measurements, experience during transport and testing of cryomodules (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
MQXFA fabrication status and schedule (in session "WP3 MQXF - Wednesday PM")
MQXFA magnet assembly and preload (in session "WP3 MQXF - Wednesday PM")
MQXFB coil fabrication (in session "WP3 MQXF - Wednesday PM")
MQXFB magnet assembly (in session "WP3 MQXF - Wednesday PM")
Optics MD results for the new HL baseline (in session "WP2/WP5/WP7")
Optimised BGC for HL-LHC (in session "WP13 - Wednesday PM Part 1")
Organisation of the operation for the HL-LHC IT String (in session "WP16 - Wednesday AM Part 1")
Overview of WP13 activities and installation plans during LS3 (in session "WP13 - Wednesday AM Part 1")
PDSU-CLIQ/DQHDS interlocking via BIS concentrator (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Performance of the BGC in the LHC (in session "WP13 - Wednesday PM Part 1")
Performance of the EO BPM prototype in the SPS (in session "WP13 - Wednesday PM Part 1")
Power deposition studies for proton losses in IR3 and IR7 (in session "WP5/WP7/WP14")
Preparation for RFD cavity and CM testing at TRIUMF (in session "WP4 - Wednesday AM Part 1")
Procurement strategy and quality reporting (in session "Plenary session 1 - Tuesday AM")
Production testing summary of the MQXFA magnets (in session "WP3 - Cold powering tests - Tuesday PM")
Progress with the HL beam dump (in session "Plenary session 1 - Tuesday PM")
Projections for 2025 & HL-LHC (in session "WP2/WP4")
Q1/Q3 production challenges (in session "WP3/WP16 - Wednesday PM")
QH strip resistances and circuit parameters in the MQXF magnets (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Qualification of the first Cold Powering System for the HL-LHC triplets (in session "Plenary session 1 - Tuesday PM")
Quality Assurance / Quality Control in the IT String (in session "WP16 - Wednesday AM Part 2")
Recap. of failure cases for round and flat optics (in session "WP2/WP5/WP7")
Reliability studies on uQDS, PDSU and PDSU-BIS concentrator interface (in session "MCF (WP7/WP3/WP6B/WP16) - Thursday AM")
Remote manipulation of VAX modules 20'+10' (in session "WP8/WP12 - Operational aspects of TAXS region - Tuesday PM")
Reviewing the high bandwidth PU technology (in session "WP13 - Wednesday PM Part 1")
RF power for crab cavities & challenges (in session "WP4 - Wednesday AM Part 2")
RFD Crab Cavity contribution from the U.S. - Status, issues and delivery dates (in session "Plenary session 2 - Monday PM")
RFD HOM coupler challenges (in session "WP4 - Wednesday AM Part 2")
RFD industrial production challenges (in session "WP4 - Wednesday AM Part 1")
RFD NCRs & future mitigation (in session "WP4 - Discussion - Tuesday PM")
RFD pre-series cavity testing (in session "WP4 - Wednesday AM Part 1")
RFD prototype at CERN overview planning (in session "WP4 - Tuesday AM")
RFD-CM Repair overview and highlight (in session "WP4 - Tuesday AM")
RFD-SPS Cryomodule: QA lessons learnt & future challenges (in session "WP4 - Wednesday PM")
RP considerations 20'+10' (in session "WP8/WP12 - Operational aspects of TAXS region - Tuesday PM")
Run 4 operational scenario (in session "Plenary session 1 - Monday PM")
Safe intervention during operation on the electrical circuits of the IT String (in session "WP16 - Wednesday AM Part 1")
Sc link Installation into the IT String (in session "WP16 - Wednesday AM Part 1")
Series cryomodule design (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
Services integration 20'+10' (in session "WP8/WP12 - Operational aspects of TAXS region - Tuesday PM")
SM18 magnet test facility upgrade, commissioning and feedback from test operation (in session "Plenary session 1 - Monday PM")
SM18 magnet tests: Progress on qualification tests and status of benches (in session "WP3 - Cold powering tests - Tuesday PM")
SM18 testing of RFD prototype & challenges (in session "WP4 - Tuesday AM")
Sorting options for HL-LHC magnets (in session "WP2/WP3 - Wednesday AM")
SPS-CC instability studies & RF feedback gain along HL cycle (in session "WP2/WP4")
Status and strategy for the BLM ionisation production (in session "WP13 - Wednesday AM Part 1")
Status of CCT magnets (in session "Plenary session 2 - Monday AM")
Status of cold mass activities at CERN (all HL-LHC WP3) (in session "WP3/WP16 - Wednesday PM")
Status of cryostat activities at CERN (all HL-LHC WP3) (in session "WP3/WP16 - Wednesday PM")
Status of D1 (in session "Plenary session 2 - Monday AM")
Status of D2 (in session "Plenary session 1 - Monday AM")
Status of DQW Crab Cavity cryomodules – UK Collaboration (in session "Plenary session 2 - Monday PM")
Status of FRAS (in session "WP2/WP3/WP19 - Thursday AM")
Status of LQXFA cold mass, cryostating and cold test (in session "Plenary session 2 - Monday AM")
Status of manufacturing TAS, TAXN & anciliairies 20'+5' (in session "WP8/WP12 - From production to installation - Thursday AM")
Status of MQXFA magnets (in session "Plenary session 2 - Monday AM")
Status of MQXFB (in session "Plenary session 1 - Monday AM")
Status of RFD cryomodules (in session "Plenary session 2 - Monday PM")
Status of the UK contributions for Beam Instrumentation and Collimation (in session "Plenary session 2 - Monday PM")
Status of US-AUP contribution (in session "Plenary session 1 - Monday AM")
Status of WP3 (in session "Plenary session 1 - Monday AM")
Status of WP4 (in session "Plenary session 2 - Monday PM")
Studies for transport of crab cavities equipment (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
Summary and status for the HL-LHC Collaborations (in session "Plenary session 1 - Monday PM")
Summary of RFD reviews at CERN (in session "WP4 - Tuesday AM")
Summary of the Beam halo working group, specifications and detector options (in session "WP13 - Wednesday PM Part 2")
Test of the SR coronagraph on LHC (in session "WP13 - Wednesday PM Part 2")
Test results of MQXF series magnets at CERN (in session "WP3 - Cold powering tests - Tuesday PM")
UK series cryomodules procurements, schedule and challenges discussion (in session "WP4 - Wednesday PM")
Update on collimation losses and halo limitations (in session "Plenary session 1 - Monday PM")
Update on electron cloud studies (in session "WP2/WP5/WP7/WP10")
Update on failure case studies (in session "WP5/WP7/WP14")
Update on the IP BPM production and delivery schedule (in session "WP13 - Wednesday AM Part 2")
Updated design of the HL Beam gas ionization monitor (in session "WP13 - Wednesday PM Part 2")
Upgrade studies for the TCDS in IR6 (in session "WP5/WP7/WP14")
Vacuum chambers : TAXS, TAXN 20'+5' (in session "WP8/WP12 - From production to installation - Thursday AM")
Vacuum, preparations for collaborations & status (in session "WP4/WP9/WP12/WP19 - Wednesday AM")
VAXBOX 20'+5' (in session "WP8/WP12 - From production to installation - Thursday AM")
VAXS modules 20'+5' (in session "WP8/WP12 - From production to installation - Thursday AM")
Welcome by INFN Genova Director & Prof. Lucio Rossi (in session "Plenary session 1 - Monday AM")
WP4 discussion on US-AUP/TRIUMF schedule (in session "WP4 - Discussion - Tuesday PM")
WP6B outlook in IT String operation (in session "Plenary session 1 - Tuesday PM")
WP12 update with a focus on beam screen production (in session "Plenary session 1 - Tuesday PM")
Wrap-up (in session "WP8/WP12 - From production to installation - Thursday AM")
Include materials from selected contributions