Speaker
Dong Ho Moon
(Chonnam National University (KR))
Description
During the High-Luminosity phase of the LHC (HL-LHC), the CMS experiment will be upgraded with a new MIP Timing Detector (MTD), which will provide precise time measurements for charged particles up to a pseudorapidity of |eta| = 3. This precise timing capability will help address the complex pile-up environment anticipated at HL-LHC, thereby extending the experiment's sensitivity to new physics. The forward region of the MTD, known as the Endcap Timing Layer (ETL), will cover a pseudorapidity range of 1.6 < |eta| < 3 and will be equipped with Low-Gain Avalanche Diodes (LGADs) paired with the Endcap Timing Read Out Chip (ETROC). This talk will present an overview of the activity of the Korean MTD group.
Author
Dong Ho Moon
(Chonnam National University (KR))