The review will focus on all beam diagnostics foreseen for the Linac 4 3MeV test stand, the Linac 4 tunnel, the new transfer line to the PS Booster and the refurbished PS Booster injection region.
For each system, the presentations will cover all aspects from functional specifications, design, high and low level software, installation plans and budget.
The review panel will be composed by C. Carli (CERN), A. Aleksandrov (ORNL), A. Feshenko (INR) and P. Forck (GSI)
The panel will meet on October 19th at 9:00 a.m. and then present a preliminary report/list of advices at 11:00.
N.B.: in the agenda timetable each slot includes 5 minutes at the end of the talk for questions and discussion.