28 June 2026 to 2 July 2026
Ghent, Belgium
Europe/Brussels timezone

The CMS CSC Electronics Upgrade and GEM-CSC Trigger for the HL-LHC

29 Jun 2026, 17:10
20m
Foyer (Coupure Blok E)

Foyer

Coupure Blok E

Poster presentation only Applications Poster session 1

Speaker

Isabelle De Bruyn (Universite Libre de Bruxelles (BE))

Description

The CMS Muon system is undergoing significant upgrades in preparation of the High-Luminosity LHC (HL-LHC) operation, in order to maintain excellent performance in unprecedented collision rates. The electronics of the Cathode Strip Chambers (CSCs) are therefore being upgraded, and the new complementary Gas Electron Multiplier (GEM) detectors are being installed. One of the new GEM stations, GE1/1, was already installed next to the most forward CSCs (ME1/1). In addition, the GE2/1 station will be installed next to the ME2/1 CSCs. Combining the information of neighbouring CSCs and GEMs will improve the muon triggering efficiency.

This talk will cover the recent developments for the CSC upgrade, modifying the trigger boards and operating a demonstrator in CMS, as well as the progress integrating GEM and CSC data into one trigger algorithm. The performance of the existing GEM-CSC trigger for GE1/1 and ME1/1 is also discussed.

Author

Isabelle De Bruyn (Universite Libre de Bruxelles (BE))

Presentation materials

There are no materials yet.