Tue-Af-Po2.17-06 [30]: Industrial production of superconducting magnets for the FAIR SIS100 accelerator

24 Sept 2019, 14:00
2h
Level 2 Posters 1

Level 2 Posters 1

Speaker

Wolfgang Walter (Babcock Noell GmbH)

Description

For the FAIR project`s SIS100 Synchrotron a series of 110 fast ramped dipoles is currently built and in addition a total of 83 superconducting quadrupole doublet modules (QDM) are needed for this accelerator.
An intense measurement program of the first of series (FoS) dipole revealed excellent behavior with respect to, e.g., quench performance and AC losses. With an optimized fabrication technique, the geometrical accuracy was improved to provide a highly homogeneous field and the series production started in 2016.
This document reports about the series manufacturing process of the 110 dipoles. NOELL describes the crucial steps of the series manufacturing and assembly processes. In addition a brief outlook on the integration of the SIS100 QDMs is given.

Primary authors

Katrin Heyn (Bilfinger Noell GmbH) Mr Alexander Bleile (GSI Helmholtzzentrum für Schwerionenforschung GmbH) Prof. Egbert Fischer (GSI Helmholtzzentrum für Schwerionenforschung GmbH) Dr Florian Kaether (GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany) Jan Patrick Meier Christian-Eric Roux (GSI) Kei Sugita (GSI) Peter-Jurgen Spiller Piotr Szwangruber (GSI Helmholtzzentrum für Schwerionenforschung GmbH) Anna Szwangruberb (GSI) Stefan Sattler (Bilfinger Noell GmbH) Rudi Schoenbein (Bilfinger Noell GmbH) Wolfgang Walter (Babcock Noell GmbH)