1 June 2019 to 30 September 2019
JINR DUBNA
Europe/Warsaw timezone
Registration is now open!

Integration of temperature monitoring software inside the Master and Slave 19 ” RACK cabinets for the Slow Control System of the MPD-TOF detector

Not scheduled
20m
347 (k. 215)

347

k. 215

Software programming (Java, 3D modelling, LabView, SCADA WinCC etc.) Thursday Final Presentations TeFeNICA and Slow Control final presentations

Speaker

Monika Kutyła (Warsaw University of Technology)

Description

To avoid getting dust inside RACKs it was decided to close them as hermetically as possible and provide the closed air loop venntilation. In each cabinet there are temperature and humidity transducers , fans modules and radiators. Using RS-485 standard based on the MODBUS protocol and modules of logic outputs, fans are being switched on and off depending on temperature inside each RACK and their work time. The cabinets are working in master-slave configuration. Software is easy to adjust to load settings from database.

Primary authors

Monika Kutyła (Warsaw University of Technology) Krystian Rosłon

Co-authors

Michalina Milewicz-Zalewska (Joint Institute for Nuclear Reactions) Marek Peryt (Warsaw University of Technology) Marcin Bielewicz (Nacional Centre for Nuclear Research) Nikita Dunin (JINR) Daniel Dabrowski (Warsaw University of Technology)

Presentation materials

There are no materials yet.