Lawrence Berkeley National Laboratory
Author in the following contributions
- First canted cosine theta Bi-2212 accelerator magnets: Fabrication, performance, and prospects
- Engineering design of a large aperture 15 T cable test facility dipole magnet
- Assembly and mechanical analysis of the Canted-Cosine-Theta subscale magnets
- Quench protection of a large aperture 15 T Cable Test Facility Nb3Sn Magnet
- Design and test results for a canted-cosine-theta dipole subscale magnet series
- Design of CCT6: a large-aperture, 12 T, Nb3Sn Dipole Magnet
- Towards 20 T hybrid accelerator dipole magnets
- Numerical Modelling of the Interfacial Debonding in Superconducting Magnets
- Design, Construction, and Testing of 0.5-m-long, 18-mm Period Nb3Sn Superconducting Undulator Magnets
- Integration of Bi-2212 and Nb3Sn CCT magnets for a hybrid magnet test