DFM Detailed Design Review
CERN
Mandate of the review committee:
1) Review the functional, technical and interfaces requirements and confirm their completeness in terms of cryogenic, mechanical and electrical aspects;
2) Review the engineering design wrt cryogenic and operational aspects and wrt mechanical and electrical aspects, including interfaces;
3) Review the integration and installation plan in the LHC machine and the compatibility of the DFM location and integration wrt the tunnel environment and interfaces with the other systems;
4) Check the conformity of the safety requirements for both cryogenic and electrical aspects and compatibility of safety equipment with tunnel environment;
5) Review plan and schedule for DFM production;
6) Review strategy and plan for QA and QC, as well as plan for intermediate and final acceptance tests.
Agenda: Time allocated for each presentation including 5 minutes for discussion