11 T Collaboration Review, 26 and 27th September 2012 (Bldg. 6-2024 on 26th Sept. and Bldg. 30-7-018 on 27th Sept.)

Europe/Zurich
6/2-024 - BE Auditorium Meyrin (CERN)

6/2-024 - BE Auditorium Meyrin

CERN

114
Show room on map
Luca Bottura (CERN), Michael Lamm (Fermi National Accelerator Laboratory (FNAL))
Description
Review jointly organized by CERN and Fermilab: The goal of the review is to assess the status of the R&D program and the plans for future model and prototype activities to reach a “ready to build” point in the next few years. In particular the review shall concentrate on the first two Phases of this R&D effort focusing on the following items: Phase 1: Results achieved and lessons learned from the first single aperture, 2-m long 11 T dipole demonstrator tested at FNAL in June 2012. Among the issues to review, we suggest the following list, without excluding any other point the review committee may find appropriate to investigate: a. Is the choice of conductor/cable, coil and mechanical structure as well as fabrication process technically sound? b. Was any problem encountered during construction or final testing understood? Are such problems addressed properly in view of the next steps? c. Was the instrumentation sufficient to evaluate fabrication procedure, validate mechanical and magnetic models and demonstrate that the magnet met specifications? d. Was testing exhaustive and providing good feedback and expectations for future successes? Phase 2a: Plans for the construction of the first 2-in-1 2-m long 11 T dipole demonstrator in CY13 at FNAL and CERN. a. Have the lessons learned in the Phase 1 been understood and used? b. Is FNAL ready to proceed with material procurement and cable, coils and collared coil construction and testing? c. Is CERN ready to proceed with yoke and mechanical structure procurement and construction? d. Are plans in place for the insertion, at CERN, of the cold masses into the yoke? e. Is there a plan for testing of the 2-in-1 magnet at CERN after assembly completion? Phase 2b: Plans for the construction of the second 2-in-1 2-m long 11 T dipole demonstrator in CY13-CY14 at CERN. a. Has technology transfer from FNAL to CERN started in earnest? b. Have the lessons learned in the Phase 1 been used? c. Have plans been made for development and decision making process of any possible alternative design for coils and/or mechanical structure? d. Are plans ready for CERN to proceed with coils and cold masses material procurement, construction and testing? Members of Review Committee: Michael Lamm, LBNL Luca Bottura, CERN Giorgio Ambrosio, Fermilab Gianluca Sabbi, LNBL Andries den Ouden, Radboud University, NL
Participants
  • Charilaos Kokkinos
  • emanuela barzi
  • Gerard Willering
  • Juan Carlos Perez
  • Marco Lopes
  • Marta Bajko
  • Oliver Brüning
  • Remy Gauthier
  • Sebastien Clement
  • Stephan Russenschuck
  • stephane fartoukh
  • Vittorio Parma
  • Wednesday 26 September
    • 1
      Review committee - Executive session 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
    • Introduction 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
      Convener: Michael Lamm (LBNL)
      • 2
        Welcome, LHC upgrade plans
        Speaker: Lucio Rossi (CERN)
        Slides
      • 3
        Collimation system upgrade plans
        Speaker: Stefano Redaelli (CERN)
        Slides
      • 4
        11 T Project goals and deliverables
        Speaker: Mikko Karppinen (CERN)
        Slides
    • 10:00
      Coffee Break 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
    • Phase 1 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
      Convener: Mr Luca Bottura (CERN)
      • 5
        Phase 1 goals, demonstrator parameters and result summary
        Speaker: Alexander Zlobin (Fermilab)
        Slides
      • 6
        Strand and cable development at FNAL
        Speaker: Emanuela Barzi (Fermilab)
        Slides
      • 7
        Demonstrator design and fabrication, lessons learned
        Speaker: Alfred Nobrega (Fermilab)
        Slides
    • 12:00
      Lunch, discussions 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
    • Phase 1 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
      • 8
        Demonstrator test program, quench performance, protection studies, and magnetic measurements
        Speaker: Guram Chlachidze (Fermilab)
        Slides
      • 9
        Analysis of magnetic measurements
        Speaker: Mikko Karppinen (CERN)
        Slides
      • 15:30
        Coffee Break
      • 10
        Phase 1 lessons and next steps (MBHSP01)
        Speaker: Alexander Zlobin (Fermilab)
        Slides
      • 11
        Discussion
      • 12
        Executive session
    • 19:00
      Social Dinner on invitation only 6/2-024 - BE Auditorium Meyrin

      6/2-024 - BE Auditorium Meyrin

      CERN

      114
      Show room on map
  • Thursday 27 September
    • 13
      Review committee – Executive session 30/7-018 - Kjell Johnsen Auditorium

      30/7-018 - Kjell Johnsen Auditorium

      CERN

      190
      Show room on map
    • Phase 2a/b 30/7-018 - Kjell Johnsen Auditorium

      30/7-018 - Kjell Johnsen Auditorium

      CERN

      190
      Show room on map
      Convener: Michael Lamm (Fermi National Accelerator Laboratory (FNAL))
      • 14
        First 2-in-1 demonstrator design and construction plan
        Speaker: Alexander Zlobin (Fermilab)
        Slides
      • 15
        Collared coil specification update, schedule, procurement status
        Speaker: Alfred Nobrega (Fermilab)
        Slides
      • 10:00
        Coffee Break
      • 16
        Second 2-in-1 demonstrator design, 2-in-1 demonstrators construction and test plan
        Speaker: Mikko Karppinen (CERN)
        Slides
      • 17
        CERN strand and cable R&D, strand procurement, and cable fabrication
        Speaker: Luc-Rene Oberli (CERN)
        Slides
      • 18
        Cable insulation, quench heater development, coil fabrication and mechanical model
        Speaker: David Smekens (CERN)
        Slides
      • 19
        Cold mass fabrication and tooling procurement
        Speaker: Frederic Savary (CERN)
        Slides
      • 12:15
        Lunch, discussions
    • Closed Session 30/6-019

      30/6-019

      CERN

      20
      Show room on map

      (Possible Tour of Facilities)

      Convener: Lucio Rossi (CERN)
    • Close-out 30/7-018 - Kjell Johnsen Auditorium

      30/7-018 - Kjell Johnsen Auditorium

      CERN

      190
      Show room on map