Session

Facility Updating

05
5 Jun 2018, 11:00

Conveners

Facility Updating

  • Toshiyasu Higo (KEK)

Description

Lecture Hall

Presentation materials

There are no materials yet.

  1. Jianhao Tan (SINAP)
    05/06/2018, 11:00

    The X-band high power test platform at SINAP have been proposed several years, now the key equipment such as klystron will delivered to Jiading campus soon, and then the installment will start.
    The high power test platform has great help for development of x-band high gradient technology at SINAP. Lots of RF activities on x-band have begun in recent years, and some results will introduced in...

    Go to contribution page
  2. Maomao Peng (Tsinghua University)
    05/06/2018, 11:25

    An X-band high power test facility at a frequency of 11.424 GHz is under constructing in Tsinghua University. The system consists of a CPI klystron with maximum output power up to 50 MW and a ScandiNova solid-state pulse modulator which provides the pulsed high voltage with the maximum flat top of 1.5 μs. Ion pumps keep super high vacuum of the inside of the klystron and the high power...

    Go to contribution page
  3. Veronica Del Pozo Romano (CERN)
    05/06/2018, 11:50

    There are 3 X-band test stands at CERN dedicated to the high gradient testing of prototype accelerating structures and RF components. This speech will cover the operational challenges, the upgrades in the algorithms for conditioning and the status of the stands during the last year.

    Go to contribution page
  4. Daniel Esperante Pereira (IFIC - University of Valencia, CSIC)
    05/06/2018, 12:15

    An S-band High-Gradient (HG) Radio Frequency (RF) laboratory is under construction and commissioning at IFIC. The purpose of the laboratory is to perform investigations of high-gradient phenomena and to develop normal-conducting RF technology, with special focus on RF systems for hadron-therapy. The layout of the facility is derived from the scheme of the Xbox-3 test facility at CERN [1] and...

    Go to contribution page
Building timetable...