Preparation of the H2/H4 beam line for 2022 operation
One week in June in H4 and two weeks in October in H2
RD51: Possible electron runs 30 GeV/c and an electron scan 20 - 250 GeV/c in the last week.
o Not really request for intensity and purity - anything would be OK for this first test.
o Currently access to 909 not allowed and we need a solution for access when the bottle is empty.
After discussion with D. Jaillet (31.03) it was agreed that a proper monitoring will be allowed for the critical RD51/GIF++ periods and the bottles will be exchanged on time in case this is needed.
Bonjour Michael,
Les demandes pour les 3 périodes sont prisent en compte par mon contractant.
Effectivement les utilisateurs n’ont pas accès à l’intérieur des bâtiments gaz.
Le niveau est géré et envoyé par mon contractant à Eraldo ~2 jours sauf le weekend.
Lorsque le système de supervision du 909 est opérationnel nous pourrons mettre à disposition une vue aux utilisateurs.
Bonne journée
David
GIF++ :
o Inform GIF++ for the installation of the beam pipe in advance
o Install the pre-dump in all their beam time ;-)