9:30 AM
|
Task 10.5 "HOM Distribution" Reports
(until 10:40 AM)
|
9:30 AM
|
Overview of HOM Distribution task 10.5
- Dr
Roger JONES
(University of Manchester/Cockcroft Institute)
|
9:40 AM
|
HOM based beam position monitors 10.5.1 (20’) – results on mode spectra and alignment,
- Mr
Pei ZHANG
(DESY/University of Manchester)
|
10:00 AM
|
HOM cavity diagnostics 10.5.2 (20') –cascade and ACE3P simulations
- Dr
Ian SHINTON
(University of Manchester)
|
10:20 AM
|
HOM geometric dependencies 10.5.3 (20’) –experimental results and simulations
- Mr
Thomas FLISGEN
(University of Rostock)
|
10:40 AM
|
--- coffee break ---
|
11:00 AM
|
Task 10.6 "LLRF at FLASH" Reports
(until 12:45 PM)
|
11:00 AM
|
FLASH upgrade 2010 and roadmap for 2011-2012
- Dr
Mariusz Grecki
(DESY)
|
11:15 AM
|
uTCA based LLRF system
- Dr
Tomasz Jezynski
(DESY)
|
11:30 AM
|
uTCA-based LLRF controller
- Dr
Dariusz Makowski
(TUL/DMCS)
|
11:45 AM
|
Firmware development for LLRF controller
-
Wojciech Jalmuzna
(TUL/DMCS)
|
12:00 PM
|
Analog signal conversion and clock distribution in the uTCA based LLRF system
- Dr
Krzysztof Czuba
(WUT-ISE)
|
12:15 PM
|
Development of fast ADC card for the LLRF system
-
Samer Bou Habib
(WUT-ISE)
|
12:30 PM
|
Beam Based Feedback at FLASH - Upgrade to mTCA
- Mr
Jaroslaw Szewinski
(IPJ Swierk)
|