08:30
|
LHC & Experiments I
(until 12:40)
|
08:30
|
Welcome
-
Ciriani, P.
|
08:35
|
Introduction to the session
-
Potter, K.
|
08:40
|
THE ALICE DIPOLE MAGNET
-
Swoboda, D.
|
09:00
|
METROLOGIE DES EXPERIENCES : DEFIS ET RESULTATS
-
Lasseur, C. , Gayde, J-C.
|
09:20
|
SYSTEME DE PLC POUR LA SUPERVISION DE LA DISTRIBUTION BASSE TENSION DES EXPERIENCES ALICE ET LHCB
-
Burdet , G.
|
09:40
|
THE RADIATION MONITORING SYSTEM FOR THE LHC EXPERIMENTS AND EXPERIMENTAL AREAS
-
Ilgner, C.
|
10:00
|
INTEGRATION OF FORWARD PHYSICS DETECTORS INTO THE LSS OF THE LHC
-
Macina, D.
|
10:20
|
COFFEE BREAK
|
10:40
|
INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS
-
Bartolome-Jimenez, S.
|
11:00
|
VACUUM CHAMBERS FOR LHC LSS
-
Costa Pinto, P.
|
11:20
|
LAYOUT DRAWINGS OF THE LHC COLLIDER
-
Vergara, A.
|
11:40
|
LARGE SCALE DEPLOYMENT OF MTF AND LESSONS LEARNED
-
Mallon, S., Manola-Poggioli, E.
|
12:00
|
INSTALLATION OF A PARTICLE ACCELERATOR: FROM THEORY TO PRACTICE
-
Foraz K., Vitasse, M., Weisz, S.
|
12:30
|
Conclusions
-
Potter, K.
|
|
08:30
|
Contracts
(until 12:30)
|
08:30
|
Introduction to the session
-
Baldy, J.L.
|
08:40
|
CIVIL ENGINEERING STATUS REPORT FOR THE CMS WORKSITE
-
Osborne, J.
|
09:00
|
TS-CV CONTRACTS FOR THE LHC : CASE STUDY FOR THE TS WORKSHOP 2004
-
Inigo Golfin, J. , Principe, R.
|
09:20
|
CONTRAT D’INSTALLATION DES CABLES C171: METHODOLOGIE ET EXPERIENCES
-
Guillaume, J-C.
|
09:40
|
THE DIFFERENT APPROACHES TO THE FM CONTRACT
-
Nonis, M.
|
10:00
|
MANAGEMENT OF TRANSPORT AND HANDLING CONTRACTS
-
Ruehl, I
|
10:20
|
COFFEE BREAK
|
10:40
|
ELECTRONICS DEVELOPMENT SUPPORT: HOW IS IT ORGANISED
-
Van der Bij, E.
|
11:00
|
L' ALIGNEMENT DES ACCELERATEURS DU CERN: DANS QUEL CONTEXTE CONTRACTUEL?
-
Missiaen, D. , Quesnel, J-P.
|
11:20
|
MANAGING THE DETECTOR FIXED GAS DISTRIBUTION CONTRACTS
-
McFarlane, D.
|
11:40
|
MANAGING THE LHC EXPERIMENTAL AREAS
-
Butin, F., Evrard, S., Gastal, M.
|
12:10
|
Conclusions
-
Baldy, J-L.
|
|
08:30
|
Design Offices
(until 12:30)
|
08:30
|
Introduction to the session
-
Kurtyka, T.
|
08:40
|
REORIENTATION DU BUREAU D’ETUDES GENIE CIVIL
-
Poehler, M.
|
09:00
|
rojet LHCLE BUREAU D’ETUDES TS/CV/BE POUR LES BESOINS DU PROJET LHC
-
Martel, C.
|
09:20
|
BUREAU DE DOCUMENTATION TS/EL/DO
-
Dujardin, M.
|
09:40
|
LE BUREAU D’ETUDES MECANIQUES DU GROUPE TS-MME
-
Menot, C.
|
10:00
|
ELECTRONICS DESIGN OFFICE ORGANIZATION, METHODS AND TOOLS
-
Van der Bij, E.
|
10:20
|
COFFEE BREAK
|
10:40
|
LE SYSTEME D’INFORMATION GEOGRAPHIQUE ET SES UTILISATEURS
-
Guyot, B.
|
11:00
|
ETUDES D'INTEGRATION POUR L'ACCELERATEUR LHC
-
Muttoni, Y.
|
11:20
|
CAD SUPPORT SECTION: TASKS AND PROJECTS
-
Friman, P., Van Utyvinck, E.
|
11:40
|
Discussion design office
-
Kurtyka, T
|
|
14:00
|
LHC & Experiments II
(until 18:00)
|
14:00
|
Introduction to the session
-
Hauviller, C.
|
14:10
|
LOGISTICS OF LHC CRYODIPOLES: FROM SIMULATION TO STORAGE MANAGEMENT
-
Foraz, K. , Nicquevert, B.
|
14:30
|
MECHANICAL DYNAMIC LOAD OF THE LHC ARC CRYO-MAGNETS DURING THE INSTALLATION
-
Artoos, K. , Capatina, O.
|
14:50
|
SECURITE DES OPERATIONS DE TRANSPORT - MANUTENTION
-
Prodon, S.
|
15:10
|
SPS EXTRACTION KICKER MAGNET - THERMAL ANALYSIS
-
Timmins, M.
|
15:30
|
BOITES DE DISTRIBUTION POUR L’ALIMENTATION ELECTRIQUE DU LHC
-
Folch, R., Trilhe, P.
|
15:50
|
COFFEE BREAK
|
16:10
|
THE LHC COLLIMATORS
-
Bertarelli, A.
|
16:30
|
INTEGRATION OF TRANSPORT AND HANDLING EQUIPMENT AT CERN – CRITERIA TO SATISFY OPERATIONAL NEEDS AND SAFETY ASPECTS
-
Bertone,C. , Boettcher, O.
|
16:50
|
LHC ACCESS SYSTEM: STATUS REPORT
-
Ninin, P.
|
17:10
|
IMPROVING INDUSTRIAL PROCESS CONTROL SYSTEMS SECURITY
-
Epting, U., Morodo, MC.
|
17:30
|
TIM (TECHNICAL INFRASTRUCTURE MONITORING) AND CCC
-
Batz, M., Sollander, P.
|
17:50
|
Conclusion
-
Hauviller, C.
|
|
14:00
|
Technology
(until 18:00)
|
14:00
|
Introduction to the session
-
Benvenuti, C.
|
14:10
|
FABRICATION DES CIRCUITS HAUTE DENSITE ET AUTRES CIRCUITS SPECIAUX
-
De Oliveira, R.
|
14:30
|
DISTURBANCES AND POWER QUALITY OF CERN'S ELECTRICAL NETWORK
-
Kahle, K.
|
14:50
|
SPECIAL COATINGS FOR THE LHC
-
Calatroni, S.
|
15:10
|
TECHNIQUES DE CONTRÔLES NON DESTRUCTIFS
-
Dalin, J.M.
|
15:30
|
COFFEE BREAK
|
15:50
|
TECHNIQUES DE FORMAGE ET D’ASSEMBLAGE
-
Favre, G. , Mathot, S.
|
16:10
|
AN APPLICATION OF POWDER METALLURGY FOR THE LHC
-
Sgobba, S.
|
16:30
|
MATERIAL STUDIES FOR CLIC RF CAVITIES
-
Taborelli, M.
|
16:50
|
MICROMETRIC ALIGNMENT METROLOGY: MEANS, DEVELOPMENTS AND APPLICATIONS
-
Mainaud Durand, H.
|
17:10
|
Conclusions
-
Benvenuti, C.
|
|
14:00
|
Discussions
(until 17:30)
|
14:00
|
Discussion Design office II
-
Kurtyka, T.
|
14:45
|
Contracts
-
Baldy, J-L.
|
15:45
|
COFFEE BREAK
|
16:05
|
Technology
-
Benvenuti, C.
|
16:50
|
Conclusions
-
Ciriani, P.
|
|