HL-LHC is in the final stage of design and prototyping: all technologies for the hardware upgrade must be fully proven by beginning of 2017. This review covers the 11T dipole, planned to substitute the LHC dipole cryo-magnets in the Dispersion Suppressor, with a new unit producing the same integrated field, requiring a bore field in the range of 11 T, and an integrated by-pass for a collimator. Previous technical reviews addressed the engineering concepts, and cost and schedule (within the overall scope of HL-LHC).
The scope of this review is to examine:
- Magnet design status, with special attention to the cold mass, its cryostat and electrical, hydraulic, mechanical, vacuum interfaces and integration in the LHC continuous cryostat and LHC arc circuit;
- By-pass and collimator design;
- Results of model magnets;
- Status of prototype magnets;
- Conductor performance, procurement status and plans;
- Status of production tooling, finalization of design and procurement;
- Components procurement, status and plans;
- Test plan, QA/QC, and safety aspects;
- Production schedule and global plan to installation (including constraints given by LS2).
Review panel: Akira Yamamoto (KEK-CERN, Chair), Giorgio Apollinari (Fermilab), Arnaud Devred (ITER), Pasquale Fabbricatore (INFN), Joe Minervini (MIT), Pierre Vedrine (CEA).
Jean-Philippe Tock (link person)
The review is scheduled on 6th to 8th April 2016, at CERN.
-
-
-
- 1
- 2
-
3
Introduction and new 11 T plan in HL-LHCSpeaker: Frederic Savary (CERN)
-
10:00
Coffee break and group photograph
-
-
4
Cryo-assembly and by-pass cryostat designSpeaker: Delio Duarte Ramos (CERN)
-
5
Coil winding and collaringSpeaker: David Smekens (CERN)
-
6
Cold mass assembly designSpeaker: Herve Prin (CERN)
-
7
Magnet powering and operation requirementsSpeaker: Samer Yammine (CERN)
-
4
-
12:30
Lunch break
-
-
8
Model magnet test results and analysis at FNALSpeaker: Alexander Zlobin (Fermilab)
-
9
CERN superconductor and cable design performanceSpeaker: Bernardo Bordini (CERN)
-
10
Model magnet production and planSpeaker: Juan Carlos Perez (CERN)
-
8
-
15:50
Coffee break
-
-
11
Model magnet test results and analysis - Quench performance vs mechanics and operation requirementsSpeaker: Gerard Willering (CERN)
-
12
Model magnet test results and analysis - Protection and operation requirementsSpeaker: Susana Izquierdo Bermudez (CERN)
-
13
Model magnet test results and analysis - Magnetic measurements and operation requirementsSpeaker: Lucio Fiscarelli (CERN)
-
11
-
-
19:00
Working Dinner (upon invitation) tbc
tbc
-
-
-
Panel closed session 6/2-024 - BE Auditorium Meyrin
-
-
14
Magnet production : agenda of the daySpeaker: Frederic Savary (CERN)
-
15
Safety and codesSpeaker: Thomas Otto (CERN)
-
16
11T QASpeaker: Rosario Principe (CERN)
-
14
-
10:10
Coffee break
-
-
17
Superconductor production plan, QA/QCSpeaker: Bernardo Bordini (CERN)
-
18
SC cable production plan, QA/QCSpeaker: Jerome Fleiter (CERN)
-
19
Collared coil procurement, status and plan, QA/QCSpeaker: David Smekens (CERN)
-
20
Cold mass procurement, status and plan, QA/QCSpeaker: Herve Prin (CERN)
-
21
Quality control tests throughout production – Factory acceptance testsSpeaker: Arnaud Pascal Foussat (CERN)
-
17
-
12:45
Lunch break
-
-
22
Cryostat procurement, status and plan, QA/QCSpeaker: Delio Duarte Ramos (CERN)
-
23
Vacuum and cryogenics systems procurement : status and plan, QA/QCSpeaker: Cedric Garion (CERN)
-
24
Powering and other systems procurement : status and plan, QA/QCSpeaker: Hugues Thiesen (CERN)
-
25
Final acceptance tests – test bench readinessSpeaker: Gerard Willering (CERN)
-
22
-
15:25
Coffee break
-
-
26
New cross-section and its rationaleSpeaker: Emelie Kristina Nilsson (CERN)
-
27
Feedback on the recommendations from the previous reviewSpeakers: Alexander Zlobin (Fermilab), Frederic Savary (CERN)
-
28
Tooling statusSpeaker: Friedrich Lackner (CERN)
-
26
-
-
Panel closed session 6/2-024 - BE Auditorium Meyrin
-
-
-
Panel closed session 180-1-N51-Meyrin
180-1-N51-Meyrin
CERN
-
29
Visit of Large Magnet Facility (for reviewers and speakers only) 180-Meyrin
180-Meyrin
CERN
-
09:45
Coffee break 180-1-N51-Meyrin
180-1-N51-Meyrin
CERN
-
12:30
Lunch break
-
-
Close-out session 30/7-018 - Kjell Johnsen Auditorium
-
30
Close-outSpeaker: Prof. Akira Yamamoto (High Energy Accelerator Research Organization (JP))
-