14:00
|
Introduction and Scope of the Review
- Prof.
Lucio Rossi
(CERN)
(30-7-018)
|
14:10
|
11 T Project Overview and Status
-
Mikko Karppinen
(CERN)
(30-7-018)
|
14:30
|
11 T 2-in-1 Magnet Design with Emphasis on FQ (Geo, Saturation, Magnetization Effects, Passive Correction) and Integration (TF Compensation and QPS)
-
Bernhard Auchmann
(CERN)
(30-7-018)
|
14:50
|
Request from LHC Optics
-
Bernhard Holzer
(CERN)
(30-7-018)
|
15:10
|
Superconductor: Parameters Space
- Mr
Luca Bottura
(CERN)
(30-7-018)
|
15:30
|
--- Coffee Break ---
|
16:00
|
SC Cable Development at FNAL (Jc,and Is Measurements, Filament Diameter, Cable Development and Cabling Issue, Cored Cable, Feedback Form Winding)
- Dr
Alexander Zlobin
(Fermilab) Ms
Emanuela Barzi Mr
Alfred Nobrega
(30-7-018)
|
16:45
|
SC Cable Development at CERN (Jc,and Is Measurements, filament Diameter, Cable Development and Cabling Issue, Cored Cable, Feedback Form Winding)
-
Luc-Rene Oberli
(CERN)
(30-7-018)
|
17:05
|
Cable Production Strategy, Material Flow
-
Amalia Ballarino
(CERN) Mr
Luca Bottura
(CERN)
(30-7-018)
|
17:45
|
Conclusion
- Prof.
Lucio Rossi
(CERN)
(30-7-018)
|
18:00
|
Meeting with key players to discuss planning, resources, etc. (if needed)
(30-7-018)
|
|
12:10
|
Possible Vacuum Issues
- Dr
Vincent Baglin
(CERN)
(30-7-018)
|
12:30
|
Discussion and Identification of Issue
(30-7-018)
|
14:15
|
Afternoon meeting with key players to settle issues (resources, planning, etc.)
(30-7-018)
|
|