2nd International Review of the HL-LHC 11 T Dipole for DS Collimation

Europe/Zurich
CERN

CERN

Akira Yamamoto (High Energy Accelerator Research Organization (JP))
Description

The High Luminosity LHC (HL-LHC) project was approved as first priority by the special CERN Council held in Brussels on 30th May 2013. In May 2014, HL-LHC was rated among the next decade top priorities of the US HEP by the P5 committee, and in June 2014 the CERN Council approved its financing for the years 2015-2025.

HL-LHC is entering the final stage of design and prototyping: all technologies for the hardware upgrade must be fully proven by end of 2016.

In the project, a particular place is given to the 11 T dipole to make room for collimators in the dispersion suppressor (DS) region as part of the LHC continuous cryostat. The 11 T project started at the end of 2010 as a joint effort between Fermilab and CERN. Fermilab has taken a strong lead in the first R&D phase, from 2011 to 2014, and is now reducing the effort due to certain budgetary conditions. A series of 2 m and 1 m long model magnets have been built and tested at Fermilab while CERN is in the process of testing its first 2 m long model magnet.

The first two full 15 m long complete magnet assemblies must be installed in 2019, to allow the collimation of increased ions collision at the LHC P2. The need for up to four more assemblies in P7 can be assessed only in 2015-16. It is therefore now the right time to review the design and the construction plan of the 11 T dipoles, assessing the results of the first R&D phase in view of the actual needs and targets for the machine, and the proposed prototyping and construction phase that should respond the needs of the LHC.

This Review will assess the Project preparedness on the front of the 11T.

Review panel: Dr. Akira Yamamoto (CERN & KEK, Chair), Dr. Joe Minervini (MIT, Co-Chair), Dr. Giorgio Apollinari (FNAL), Dr. Jim Kerby (ANL), Dr. Shlomo Caspi (LBNL).

11T Review Group

 

Charges
Close-out report
Final report
Meeting rooms
Slides
Participants
    • 08:15 09:00
      Executive Session 45m 61-1-017 (Room D)

      61-1-017 (Room D)

      CERN

    • 09:00 09:10
      Welcome and introduction 10m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Prof. Lucio Rossi (CERN)
      Slides
    • 09:10 09:30
      The collimation project - 15' + 5' 20m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Stefano Redaelli (CERN)
      Slides
    • 09:30 10:00
    • 10:00 10:15
      Coffee break 15m Lobby Building 40

      Lobby Building 40

      CERN

    • 10:15 10:40
      Beam specifications - 15' + 10' 25m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Massimo Giovannozzi (CERN)
      Slides
    • 10:40 11:10
      Electromagnetic design - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Susana Izquierdo Bermudez (CERN)
      Slides
    • 11:10 11:40
      Mechanical design - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      Speaker: Dr Friedrich Lackner (CERN)
      Slides
    • 11:40 12:10
      Quench protection - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Susana Izquierdo Bermudez (CERN)
      Slides
    • 12:10 13:30
      Lunch break 1h 20m
    • 13:30 14:00
      Executive Session 30m 61-1-017 (Room D)

      61-1-017 (Room D)

      CERN

    • 14:00 14:30
      11T cable development and procurement strategy at CERN - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      Speaker: Dr Bernardo Bordini (CERN)
      Slides
    • 14:30 15:00
      Design of the cryo-assembly - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Delio Duarte Ramos (CERN)
      Slides
    • 15:00 15:30
      Design of the 6 m cold mass assembly - 20' + 10' 30m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Herve Prin (CERN)
      Slides
    • 15:30 16:00
      Coffee break 30m Lobby Building 40

      Lobby Building 40

      CERN

    • 16:00 16:25
      11T dipole electrical circuit - 15' + 10' 25m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Ludovic Grand-Clement (CERN)
      Slides
    • 16:25 16:50
      Powering = 15' + 10' 25m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Hugues Thiesen (CERN)
      Slides
    • 16:50 17:15
      ELQA and protection in the machine - 15' + 10' 25m 40-S2-D01

      40-S2-D01

      CERN

      Speaker: Dr Arjan Verweij (CERN)
      Slides
    • 17:15 18:15
      Executive Session 1h 40-S2-D01

      40-S2-D01

      CERN

    • 19:30 21:30
      Review Dinner 2h Auberge de Satigny (CH)

      Auberge de Satigny (CH)

      CERN

    • 08:15 09:00
      Executive Session 45m 30/6-041

      30/6-041

      CERN

      Show room on map
    • 09:00 09:30
      Analysis of the production data from CERN – Part 1 - 20' + 10' 30m 112-R-028

      112-R-028

      Speaker: Mr David Smekens (CERN)
      Slides
    • 09:30 10:00
      Analysis of the production data from CERN – Part 2 - 20' + 10' 30m 112-R-028

      112-R-028

      Speaker: Mr Christian Hannes Loffler (CERN)
      Slides
    • 10:00 10:30
      Coffee break 30m 112/R-028

      112/R-028

      CERN

      38
      Show room on map
    • 10:30 11:10
      Design features of FNAL 11T dipole models and analysis of the production data from FNAL - 30' + 10' 40m 112/R-028

      112/R-028

      CERN

      38
      Show room on map
      Speaker: Dr Alfred Nobrega (Fermi National Accelerator Lab. (US))
      Slides
    • 11:10 12:10
      Visit of the large magnet laboratory in B180 1h Building 180

      Building 180

      CERN

    • 12:10 13:10
      Lunch break 1h Building 927

      Building 927

      CERN

    • 13:10 14:00
      Visit of the magnet facility in B927 50m Building 927

      Building 927

      CERN

    • 14:00 14:30
      Powering tests results - 20' + 10' 30m 864-1-D02

      864-1-D02

      CERN

      Speaker: Dr Gerard Willering (CERN)
      Slides
    • 14:30 15:00
      Magnetic measurements and analysis at CERN - 20' + 10' 30m 864-1-D02

      864-1-D02

      CERN

      Speakers: Dr Lucio Fiscarelli (CERN), Dr Olaf Dunkel (CERN)
      Slides
    • 15:00 15:40
      Summary of tests results at FNAL - 30' + 10' 40m 864-1-D02

      864-1-D02

      CERN

      Speaker: Dr Alexander Zlobin (Fermilab)
    • 15:40 16:00
      Coffee break 20m 864 Coffee area

      864 Coffee area

      CERN

    • 16:00 16:30
    • 16:30 16:55
      From winding to impregnation - 15' + 10' 25m 864-1-D02

      864-1-D02

      CERN

      Speaker: Dr Raul Moron-Ballester (CERN)
      Slides
    • 16:55 17:20
      From collaring to cold mass finishing - 15' + 10' 25m 864-1-D02

      864-1-D02

      CERN

      Speaker: Mr Christian Hannes Loffler (CERN)
      Slides
    • 17:20 18:20
      Executive Session 1h 61-1-007 (Room B)

      61-1-007 (Room B)

      CERN

    • 08:15 09:00
      Executive Session 45m 60/5-012

      60/5-012

      CERN

      14
      Show room on map
    • 09:00 10:30
      Additional presentations as needed, or specific sessions upon request of the review committee 1h 30m 60/5-012

      60/5-012

      CERN

      14
      Show room on map
    • 10:30 10:45
      Coffee break 15m
    • 10:45 11:30
      Executive Session 45m 60/5-012

      60/5-012

      CERN

      14
      Show room on map
    • 11:30 12:15
      Close-out 45m 40-S2-A01

      40-S2-A01

      CERN

      Slides