DEELS - Diagnostics Experts of European Light Sources

from Monday, June 3, 2019 (10:00 AM) to Wednesday, June 5, 2019 (4:50 PM)
ESRF (MD-1-21)

        : Sessions
    /     : Talks
        : Breaks
Jun 3, 2019
Jun 4, 2019
Jun 5, 2019
AM
8:30 AM Optimisation of the BPM data filtering for the fast orbit correction - Eric PLOUVIEZ (ESRF)   (MD-1-21)
8:50 AM BPM and Global Feedback for Elettra 2.0 - Dr Gabriele Brajnik (Elettra - Sincrotrone Trieste)   (MD-1-21)
9:15 AM Investigation status of amplitude jumps on Libera electronics - Mr Borut Repic (Instrumentation Technologies)   (MD-1-21)
9:40 AM --- Coffee Break ---
10:15 AM The design of bunch-by-bunch beam position monitor - Xinger Zhang (IHEP)   (MD-1-21)
10:35 AM The development and application of digital BPM signal processor at SSRF - Dr Longwei Lai (SSRF)   (MD-1-21)
11:00 AM Will we ever stop developping "BPM-electronics" ? - Mr Kees Scheidt (ESRF)   (MD-1-21)
11:15 AM --- Discussion ---
8:30 AM New FPGA platform to upgrade the Cavity BPM Systems at Fermi@Elettra - Raffaele De Monte (Elettra Sincrotrone Trieste SCpA)   (MD-1-21)
8:55 AM ALBA optical fiber BLMs - angel olmos   (MD-1-21)
9:15 AM SOLEIL New Beam Loss Monitor System - Nicolas HUBERT (Synchrotron Soleil)   (MD-1-21)
9:40 AM --- Coffee break ---
10:10 AM Improvements of transverse and longitudinal beam diagnostics in SACLA - Hirokazu Maesaka (RIKEN SPring-8 Center)   (MD-1-21)
10:35 AM Installation of a THz beamline for machine studies and operation @ SOLEIL - Marie labat   (MD-1-21)
10:55 AM Scintillating screens issues at the European XFEL - Mr Artem Novokshonov (DESY)   (MD-1-21)
11:20 AM OASYS overview - Laura Torino (ESRF)   (MD-1-21)
11:40 AM --- Discussion ---
11:50 AM --- Conclusion ---
PM
12:00 PM --- Participants arrival + lunch ---
1:45 PM Workshop Welcome   (MD-1-21)
2:00 PM Installing a light-source with the beam-lines already in place ... - Mr David Martin (ESRF) Mr Kees scheidt (ESRF)   (MD-1-21)
2:45 PM Overview of Diagnostics for SLS2.0 - Cigdem Ozkan Loch (PSI - Paul Scherrer Institut)   (MD-1-21)
3:05 PM --- Coffee break ---
3:35 PM The design of HEPS beam diagnostics system - Yanfeng Sui   (MD-1-21)
4:00 PM Beam diagnostics for fourth generation Russian light source. Concept of the high performance beam position monitoring system. - Dmitry Liakin (NRC KI)   (MD-1-21)
4:20 PM APS Upgrade Beam Diagnostics and R&D Results - Dr Nicholas Sereno (Argonne National Laboratory)   (MD-1-21)
4:50 PM --- Discussion ---
5:00 PM ESRF visit   (MD-1-21)
12:00 PM --- Lunch ---
1:30 PM BPM blocks offset calibration using Lamberson method - Benoît Roche (ESRF)   (MD-1-21)
1:55 PM VNA measurements of 6mm buttons in button block - Dr Guenther Rehm (Diamond Light Source)   (MD-1-21)
2:10 PM Measurement of BPM Cable Dependence To Humidity and Temperature Variations - Mr Nicolas HUBERT (Synchrotron SOLEIL)   (MD-1-21)
2:30 PM Offset calibration for single pass BPM - takahiro fujita (JASRI)   (MD-1-21)
2:50 PM --- Coffee Break ---
3:20 PM Calculation of corrected BPM data with polynomials obtained from BpmLab: ESRF and ALBA showcases - Dr Andriy Nosych (ALBA CELLS (ES))   (MD-1-21)
3:45 PM BPM resolution studies at PETRA III - Gero Kube (DESY)   (MD-1-21)
4:10 PM High speed Tune Measurement using Phase Following on Multi-Bunch Feedback - Michael Abbott (Diamond Light Source)   (MD-1-21)
4:30 PM Evaluation of a new 500 MHz digitizer at Elettra and Fermi - Peter Leban (Instrumentation Technologies, d.d.)   (MD-1-21)
4:50 PM --- Dinner ---
12:00 PM --- Lunch ---